My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/08/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/08/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 7:02:35 PM
Creation date
3/23/2016 8:46:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/08/2014
Meeting Body
Board of County Commissioners
Book and Page
351
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VE.tif
SmeadsoftID
13695
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />Construction of Indian River Lagoon Greenway, Phase 2B <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: Indian River Lagoon Greenway, Phase 2B <br />Bid Number: 2014029 <br />Project Address: 850 Indian River Boulevard <br />Vero Beach, FL <br />ARTICLE 3 — ENGINEER <br />3.01 Knight, McGuire & Associates, Inc. is hereinafter called the ENGINEER and will act as OWNER's <br />representative, assume all duties and responsibilities, and have the rights and authority assigned to <br />ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with <br />the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 60th day after the date <br />when the Contract Times commence to run. <br />Page 1 of 7 <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.