My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/08/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/08/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 7:02:35 PM
Creation date
3/23/2016 8:46:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/08/2014
Meeting Body
Board of County Commissioners
Book and Page
351
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VE.tif
SmeadsoftID
13695
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br />means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the <br />Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br />with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 1 to 7, inclusive); <br />2. Notice to Proceed <br />3. Public Construction Bond (pages _ to , inclusive); <br />4. Certificate of Liability insurance <br />5. Invitation To Bid, Including Appendices A through C <br />6. Drawings consisting of a cover sheet and sheets numbered 1 of 3 through 3 of 3, with each <br />sheet bearing the following general title: Indian River County Lagoon Greenway; <br />7. Addenda (numbers 1. to 2, inclusive); <br />Page 4 of 7 <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.