My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/08/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/08/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 7:02:35 PM
Creation date
3/23/2016 8:46:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/08/2014
Meeting Body
Board of County Commissioners
Book and Page
351
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VE.tif
SmeadsoftID
13695
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />( ()NSF;A I. <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />Christopher J. Kafer, Jr., P.E., County Enginee <br />FROM: Michael D. Nixon, P.E., Roadway Production Manager4/ <br />SUBJECT: <br />DATE: <br />Change Order No. 4 and Release of Retainage <br />Old Dixie Highway Sidewalk from 8th Street to SR 60 <br />IRC Project No. 1102 Bid No. 2012052 <br />March 20, 2014 <br />DESCRIPTION AND CONDITIONS <br />On November 13, 2012, the Board of County Commissioners awarded Bid No. 2012052 to Timothy <br />Rose Contracting, Inc. in the amount of $325,518.37 for the construction of 1''A miles of 5 -foot <br />wide concrete sidewalk along the east side Old Dixie Highway. This project is funded by a Florida <br />Department of Transportation Local Agency Program (LAP) grant, FM No. 425710-1-58-01. Three <br />Change Orders have been approved to date by the Board of County Commissioners, increasing the <br />total contract to $422,321.94. <br />Change Order No. 4 is to make final adjustments to contract bid items to decrease the total <br />contract price by $6,604.14 for a final cost of $415,717.80 and to add justified time due to <br />additional work requested by the County. <br />Timothy Rose Contracting, Inc. has been paid $391,529.62 to date, with $19,576.48 held in <br />retainage. Timothy Rose Contracting, Inc. has completed the project and submitted Pay <br />Application No. 9 (Final) for final payment and release of retainage in the amount of $43,764.66. <br />FUNDING <br />Funding for this project is reimbursable from the FDOT Local Agency Program (LAP) grant, FM No. <br />425710-1-58-01. Payment for Timothy Rose Contracting, Inc. Pay Application No. 9 (Final) is <br />budgeted and available from Optional Sales Tax, Account No. 31521441-066510-12814, Old Dixie <br />Highway Sidewalk (8th Street to 20th Street) in the amount of $24,188.18 and from Optional Sales <br />Tax Retainage Account No. 315-206000-12814, Old Dixie Highway Sidewalk (8th Street to 20th <br />Street) in the amount of $19,576.48 for a total of $43,764.66. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1101-01d Dixie Hwy Swk 8th St to SR 60-LAP\Adnim\agenda items\BCC <br />Agenda FINAL CO - Release of Retain. 3-10-14.doc <br />65 <br />