Laserfiche WebLink
CERTIFICATION OF ARCHITECT OR CONSULTING ENGINEER (WHERE APPLICABLE): <br />I certify that I have checked and verify the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it is a true and correct statement of the work <br />performed and/or material supplied by the Contractor. <br />Dated <br />(ARCHITECT / ENGINEER) SIGNATURE <br />CERTIFICATION OF ENGINEER / INSPECTOR: <br />I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br />Payments and the notes and reports of my inspections of the project. It is my opinion that this <br />statement of work performed and/or materials supplied is accurate, that the Contractor is observing <br />the requirements of the Contract, and that the Contractor should be paid the amount requested <br />above. <br />Dated <br />Accompanying Documentation: <br />( ENGINEER/INSPECTOR) SIGNATURE <br />* * END OF SECTION * * <br />Page 2 of 2 <br />00622-2 <br />C:1UserslOwner\Documents\Old Dixie Hwy Sidewalk ImpsCover PA # 9 FINAL.doc <br />68 <br />