My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/10/2014AP
CBCC
>
Meetings
>
2010's
>
2014
>
06/10/2014AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:59:49 AM
Creation date
3/23/2016 8:47:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/10/2014
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0014-R
Book and Page
175
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VP.tif
SmeadsoftID
13706
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ten sets of complete Conceptual, Preliminary or Final PD(final plat plans must be signed and sealed by <br /> surveyor). Plans as per Chapter 915,pursuant to the type of approval being requested. <br /> `r Any requirements of the zoning or subdivision ordinance which the applicant is requesting to be waived <br /> (such as minimum lot width and size, street frontage requirements, setbacks, etc.), shall be clearly <br /> indicated by section and paragraph numbers, together with the rationale for the waiver request(s), on an <br /> attached sheet. <br /> Y 2 Aerials for conceptual or preliminary PDs <br /> Itemized response to pre-application for conceptual or concurrent applications <br /> 2 sealed surveys <br /> 3 sets of floor plans and elevation for commercial or multi-family buildings <br /> IV!IV!D Written Statement and Photograph of Posted Sign <br /> For Final Plat's only <br /> CONSTRUCTION COMPLETE-BUILT OUT: <br /> (A) Certificate of Completion from Public Works or copy of letter to Public Works and Utilities <br /> requiring inspection of improvements <br /> IF IMPROVEMENTS ARE DEDICATED TO THE PUBLIC: <br /> (B) Original Engineer's Certified Cost for Improvements(Signed and Sealed)OR <br /> CONSTRUCTION INCOMPLETE-BONDING OUT: <br /> (A) Original Engineer's Certified Cost Estimate for Improvements(Signed and Sealed) <br /> COPIES OF DOCUMENTS TO BE RECORDED WITH THE FINAL PLAT: <br /> a. Covenants,Deed Restrictions,Bylaws,etc.or Statement There Are None <br /> b. Property Owner's Association Articles of Incorporation or Statement Indicating Why Recording of <br /> POA is Not Required <br /> vow <br /> FACommuniry Devolopment\Users\CurDev\Applications\PDAPP.doe Revised January 2011 Pale 3 of 3 108 <br /> ATTACHMENT 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.