My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/10/2014AP
CBCC
>
Meetings
>
2010's
>
2014
>
06/10/2014AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:59:49 AM
Creation date
3/23/2016 8:47:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/10/2014
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0014-R
Book and Page
175
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VP.tif
SmeadsoftID
13706
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II Indian River CountyDe 4rtment of Utilities <br /> LABOR AND MATERIALS COST ESTIMATE J LABOR CONTRACTOR'S BID ITEM LIST <br /> LABOR CONTRACTOR: MELVIN BUSH CONSTRUCTION,INC. <br /> US 1 South 12"HDPE Directional Bore <br /> Replacement of Existing 10"AC Water Main <br /> from 21st Street SE 1000'to the North and <br /> 10"PVC Force Main Replacement n/o <br /> Project: Young's Market <br /> Date: June 2,2014 <br /> MELVIN BUSH LABOR COST MATERIALS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Description Quantity Measure Price Price Price Price <br /> 71 Mobilization,Demobilization,MOT 10% % 0.10 $8,425.00 <br /> Ole Install 6"PVC Water Main 100 LF 6.00 $600.00 4.00 $400.00 <br /> Old Install 8"PVC Water Main 100 LF 7.00 $700.00 7.00 $700.00 <br /> Olf Install 12"PVC Water Main 100 LF $9.00 $900.00 $15.00 $1,500.00 <br /> Install12" P Directionalore c u mg Fusion o <br /> 05e Pipe and MJ Adapters(Water Main and Force Main 1,350 LF $41.00 $55,350.00 <br /> $17.00 $22,950.00 <br /> Replacement) <br /> 17b Install 6"Gate Valve 1 EA $125.00 $125.00 $450.00 $450.00 <br /> 17c Install 8"Gate Valve 1 EA $160.00 $160.00 $750.00 $750.00 <br /> 17d Install 10"GV&B 1 EA $175.00 $175.00 $950.00 $950.00 <br /> 17e Install 12"GV&B 2 EA. $250.00 $500.00 $1,200.00 $2,400.00 <br /> ]9b Install 2"ARV,GV,Manhole structure and cover on <br /> Directional Bore Water Main 2 EA $700.00 $1,400.00 $3,500.00 $7,000.00 <br /> Install 4"ARV,GV,Manhole structure and cover on <br /> 19 Directional Bore Force Main 2 EA $1,000.00 $2,000.00 $4,500.00 $9,000.00 <br /> 29f Install 10"PVC Force Main 100 LF $9.00 $900.00 $11.00 $1,100.00 <br /> I 1 b Grout Pipe Abandoned and Left in Place,10"through <br /> 12" 11300 LF $8.00 $10,400.00 $0.00 <br /> 07 Install Mechanical Restrained Joint DI Fittings 2.00 TON $3,500.00 1 $7,000.00 $3,500.00 $7,000.00 <br /> 21 Test Holes/Potholes 20 EA. $200.00 $4,000.00 $0.00 <br /> 64a Lawn Restoration(Topsoil and Sod) 100.0 LF $0.40 $40.00 $2.50 $250.00 <br /> Subtotal Water System $84,250.00 $54,450.00 <br /> Subtotal ater System Labor, Mob.,Uemob., <br /> Subtotal Materials, &Permitting $92,675.00 <br /> Public Constructio nd Allowance(la5Fr cost over <br /> $100,000.00) 1 0 0.04 $3,707.00 <br /> Force Accnt. IRCDUS Contingency Account 1 % 0.10 S9.267.50 <br /> $5,445.00 <br /> TOTALS $105,649.50 $59,895.00 <br /> LABOR TOTAL ROUNDED $106,000.00 MAT.TOTAL R $60,000.00 <br /> TOTAL ROUNDED $166,000.00 <br /> ATTACHMENT 1 <br /> J <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.