My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2014
CBCC
>
Meetings
>
2010's
>
2014
>
06/17/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 11:18:44 AM
Creation date
3/23/2016 8:48:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/17/2014
Meeting Body
Board of County Commissioners
Book and Page
144
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VR.tif
SmeadsoftID
13708
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br /> CONTINUING CONTRACT AGREEMENT FOR <br /> PROFESSIONAL SERVICES <br /> AMENDMENT #1 TO WORK AUTHORIZATION NO. 6 TO THE CONTINUING <br /> CONTRACT, AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN KIMLEY- <br /> HORN AND ASSOCIATES, INC.AND INDIAN RIVER COUNTY,FLORIDA. <br /> This is an amendment to the existing Continuing Contract Agreement (AGREEMENT) dated <br /> November 15'h, 2011 between Kimley-Horn and Associates, Inc. (ENGINEER) and Indian River <br /> County (COUNTY). This work authorization addresses changes in "Scope of Services" and <br /> "Compensation" of the AGREEMENT. <br /> Amendment #1 Work Authorization Description <br /> This Work Authorization includes the following: <br /> "SCOPE OF SERVICES" is being modified to incorporate the following: <br /> low A. Revisions to Gifford Neighborhood 45`h Street Streetscape Design Plans <br /> ENGINEER will provide professional services as specifically stated below: <br /> I. Addition of Bike Lanes, Curbing of Street_Intersections & H-3,Canal Culvert <br /> Extensions at Street Intersections—Based on our meeting with County staff April <br /> 24, 2014, the COUNTY requested that the ENGINEER revise the landscape <br /> construction plans to include 5-ft paved shoulders along both sides of 45`h Street <br /> between 43rd Avenue and US Highway 1, provide for a westbound right turn lane <br /> at 28`h Court and provide for clear zone mitigation measures at the northern side <br /> street connections along 45`h Street by adding curbing. <br /> In addition, the ENGINEER was requested to delineate future improvements to <br /> the southern side street connections to 45`h Street consisting of side drain <br /> replacements within Indian River Farms Water Control District Lateral H-3 canal <br /> to extend the canal culverts +/- 50' on either side of the cross streets to allow <br /> more landscape opportunity. <br /> ATTACHMENT 2 <br /> 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.