My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/03/2014
CBCC
>
Meetings
>
2010's
>
2014
>
06/03/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:30:55 PM
Creation date
3/23/2016 8:47:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/03/2014
Meeting Body
Board of County Commissioners
Book and Page
294
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VN.tif
SmeadsoftID
13704
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1 includes project planning and management responsibilities. Task 2 includes meeting <br />attendance and interaction with regulatory agencies. Task 3 includes preparation of the annual <br />environmental liability evaluation (including five sites) in response to Governmental Accounting <br />Standards Board Statement No. 49 (GASB No. 49), Accounting and Financial Reporting for Pollution <br />Remediation Obligations, which requires the inclusion and calculation of pollution remediation <br />obligations. Task 4 includes field preparation, groundwater sampling, and water level measurements <br />(for a total of 91 wells). Task 5 includes data evaluation and semi-annual reporting. Task 6 includes <br />dismantling the IP&T system and recycling and/or disposing of the components. <br />Comparatively, the sampling and reporting portion of the current work order is within the previous <br />level of effort provided by Geosyntec. The one additional task in this work order includes the IP&T <br />system dismantling, which is the first step necessary to return the property to <br />redevelopment/leasable/sellable conditions. As a brief update, Geosyntec has completed the <br />redevelopment assessment activities in accordance with their independent scope of work with the <br />Treasure Coast Regional Planning Council (TCRPC). SWDD staff will provide a detailed update at a <br />future Board meeting when the final report is available. <br />FUNDING: <br />Funding for this work is budgeted and available in account number 31521734-033490-03004, which <br />is the one cent sales tax fund used for infrastructure needs of the County. Costs associated with the <br />landfills are authorized uses of the one cent sales tax in addition to infrastructure. <br />ACCOUNT NO.: <br />Description <br />Account Number <br />Amount <br />One Cent Sales Tax Fund — Infrastructure Needs <br />31521734-033490-03004 <br />$126,081 <br />RECOMMENDATION: <br />Staff recommends that the SWDD Board approves and authorizes the Chairman to sign the <br />attached Work Order No. 9 authorizing Geosyntec to provide groundwater monitoring/reporting <br />and related consulting services for the Former Gifford Road Landfill in compliance with FDEP <br />requirements for a period of one year not to exceed fee of $126,081. <br />ATTACHMENT: Geosyntec Work Order No. 9 <br />APPROVED FOR AGENDA: <br />By: l �� a)'�'�1� r� <br />For: <br />JosepilA. Baird, County Administrator <br />Date <br />Indian River Co. <br />Approved <br />Date <br />Administration <br />+/� <br />%'f <br />Legal <br />` Vl <br />s' -? ( ( <br />Budget <br />ak <br />5(Z'$ I4 <br />SWDD <br />or <br />5 /l <br />SWDD -Finance <br />C <br />5- -Pi <br />SWDD Agenda - Geosyntec Work Order No 9 - Former South Gifford Road Landfill Groundwater Sampling Reporting <br />Page - 2 - <br />129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.