Laserfiche WebLink
PR 14027 <br />Table 4 <br />MAY 2014 BUDGET ESTIMATE <br />SOUTH GIFFORD ROAD LANDFILL <br />• <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED TIMATBUDGED <br />A. Professional Services <br />Senior Project Geologist <br />hr <br />$179 <br />4 <br />$716 <br />Geologist <br />hr <br />$128 <br />24 <br />$3,072 <br />Senior Staff Geologist <br />hr <br />$113 <br />124 <br />$14,012 <br />Subtotal Professional Services <br />$17,800 <br />. Technical/Administrative Services <br />Field Superintendent <br />hr <br />$113 <br />150 <br />$16,950 <br />Administrative Assistant <br />hr <br />$90 <br />2 <br />$180 <br />Subtotal Technical/Administrative Services <br />$17,130 <br />C. Subcontractors <br />Laboratory Analysis for VOCs <br />each <br />$80 <br />92 <br />$7,383 <br />Laboratory Analysis for TOC <br />each <br />$27 <br />3 <br />$80 <br />Laboratory Analysis for Dissolved Gases <br />each <br />$64 <br />14 <br />$899 <br />Laboratory Analysis for Dhc <br />each <br />$305 <br />2 <br />$610 <br />Laboratory Analysis for vcrA <br />each <br />$144 <br />2 <br />$289 <br />Subtotal Subcontractor Services <br />$9,261 <br />D. - Reimbursables: <br />PDBs-Field Ready <br />each <br />$30.50 <br />72 <br />$2,196 <br />PDBs Reusable Supplies/Shipping <br />LS <br />$500.00 <br />1 <br />$500 <br />Drums <br />each <br />$50.00 <br />3 <br />$150 <br />Drum Transport <br />each <br />$963.00 <br />2 <br />$1,926 <br />Lodging <br />day <br />$101 <br />18 <br />$1,818 <br />Per Diem <br />day <br />$51 <br />18 <br />$918 <br />Communications Fee <br />3% labor <br />0.03 <br />$34,930 <br />$1,048 <br />Field Vehicle <br />day <br />$97 <br />20 <br />$1,940 <br />8.5"x11" Photocopies <br />each <br />$0.12 <br />160 <br />$19 <br />Overnight Cooler <br />each <br />$95 <br />2 <br />$190 <br />Groundwater Sampling Kit <br />day <br />$275 <br />5 <br />$1,375 <br />Water Level Measurement Kit <br />day <br />$55 <br />2 <br />$110 <br />PDB Deployment Kit <br />day <br />$100 <br />2 <br />$200 <br />Equipment Shipping <br />each <br />$54 <br />2 <br />$108 <br />Subtotal Reimbursables <br />$12,498 <br />TOTAL ESTIMATED BUDGET PHASE',4 <br />$56,689 <br />TOTAL ESTIMATED BUDGET FOR THE EACH EVENT <br />, $28,344 <br />Notes: <br />1. Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa.gov). <br />2. Groundwater Sampling Kit includes two sets of the following: water level indicator, peristaltic pump, water quality meter (pH, <br />temperature, conductivity, dissolved oxygen, and oxidation reduction potential), turbidity meter, tubing, and miscellaneous field supplie <br />3. Water Level Measurement Kit includes: water level indicator and miscellaneous field supplies. <br />4. PDB Deployment Kit includes: miscellaneous field supplies necessary to suspend and deploy PDBs. <br />Geosyntec Consultants <br />142 <br />