My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/15/2014 (5)
CBCC
>
Meetings
>
2010's
>
2014
>
07/15/2014 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2018 2:59:20 PM
Creation date
3/23/2016 8:49:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/15/2014
Meeting Body
Board of County Commissioners
Book and Page
170
Subject
Gifford Neighborhood Plan
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003YP.tif
SmeadsoftID
13742
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gifford Neighborhood Plan 2014 <br /> maintenance activities, the County will provide various infrastructure improvements and enhancements that serve the <br /> Gifford community. <br /> Obiective 7. Sidewalk Improvements <br /> By 2017, there will be continuous sidewalks in place along 45th Street, from 43`d Avenue to U.S. #1 and by 2021 along 45th Street <br /> from 43`d Avenue to 58th Avenue, and by 2021 along 43`d Avenue from 491h Street to 26th Street/Aviation Boulevard, and by 2024 <br /> along 41st Street and 491h Street from 58th Avenue to U.S. #1. <br /> Action 7.1 — Each year, through 2020, the MPO will determine if any funding opportunities are available for sidewalks and trails in <br /> the Gifford area, and will apply for any available funds. The MPO will notify the Progressive Civic League of Gifford of potential <br /> funding opportunities. <br /> Action 7.2 —By 2018, the County will repair and connect the sidewalk along 43`d Avenue between 41St Street and 49th Street, and by <br /> 2020 the County will construct a sidewalk along 43`d Avenue from 41St Street to 26th Street/Aviation Boulevard. <br /> Action 7.3 — By 2017, the County Public Works Department will repair, connect, and construct the sidewalk along 45th Street, from <br /> 43`d Avenue to U.S. #1 and by 2021 along 45th from 43`d Avenue to 58th Avenue, where necessary right-of-way is available (has been <br /> acquired). The County will seek to install segments of a 45th Street sidewalk between 43`d Avenue and 58th Avenue prior to 2021. <br /> Action 7.4—By 2024, the County Public Works Department will repair, connect, and construct a sidewalk along 41St Street from 58th <br /> Avenue to U.S. #1, and a sidewalk along 49th Street from Fire Station 12 to U.S. #1, where necessary right-of-way is available (has <br /> been acquired) and adequate funding has been obtained. <br /> Obiective 8. Street Maintenance <br /> All publically dedicated streets in Gifford will continue to be adequately maintained through resurfacing projects. Adequate <br /> maintenance is defined as a ranking of 1, 2, 3, or 4 on the Road and Bridge Roadway Maintenance Condition Inventory which ranks <br /> road conditions 1-5 from best to worst. Roads ranked in 2014 as a 4 or 5 include 34th Avenue from 45th Street to 491h Street, 35th <br /> Avenue from 47th Street to 491h Street, and 38th Avenue from 45th Street to 47th Street. <br /> Action 8.1 — Each year, the County Road and Bridge Division will monitor publicly dedicated street conditions in Gifford, rank <br /> r projects for resurfacing and/or repair, and schedule resurfacing projects for roadways ranked 5. Each year, a copy of the latest annual <br /> N report and any resurfacing schedule will be provided to the Progressive Civic League of Gifford. <br /> � Community Development <br /> Indian River County 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.