My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/2014
CBCC
>
Meetings
>
2010's
>
2014
>
07/01/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:14:50 PM
Creation date
3/23/2016 8:48:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/01/2014
Meeting Body
Board of County Commissioners
Book and Page
212
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VS.tif
SmeadsoftID
13709
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cSmith <br />1701 Highway A 1 A Suite 301 <br />Vero Beach, Florida 32963 <br />tel: 772-231-4301 <br />fax: 772-231-4998 <br />June 6, 2014 <br />Mr. Vincent Burke, P.E. <br />Director of Utility Services <br />Indian River County <br />1801 27th Street, Building A <br />Vero Beach, Florida 32960 <br />Subject: Continuing Consulting Services <br />Work Order No. 12 <br />Final Design, Permitting and Bidding Services for Proposed Well No. 7 <br />Dear Mr. Burke: <br />In August 2009, the Board of County Commissioners approved a Work Order under which CDM Smith <br />�.► Inc. (formerly CDM Inc.) designed the proposed seventh production well and corresponding <br />transmission pipeline at the South County Water Treatment Plant (WTP). Upon completion of the 100 <br />percent design documents (minus the County's front-end bid documents), the County opted to place the <br />project on hold. At this time, staff wishes to enlist CDM Smith's services to update the previously <br />prepared plans and specifications, finalize the bid package and obtain any necessary permits for the <br />construction of the new well. Transmitted herewith are three copies of Work Order No. 12 (Exhibits A <br />and B) to provide the updated plans and specifications, permitting services and bidding for the proposed <br />Well No. 7 at the South County WTP. <br />Please feel free to contact our office if you require any additional information. <br />Sincerely, <br />tt,>�ta Q�- <br />Jill T. Grimaldi, BCFS <br />Principal Scientist <br />CDM Smith Inc. <br />JTG/EJG/jj <br />Attachments (3) <br />File: 0000-EJGMK-MG.IRC <br />cc: Arjuna Weragoda <br />Approved by: <br />Eric y..Grotke, P.E., BCEE <br />Vice President <br />CDM Smith Inc. <br />490 doc <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.