My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/2014
CBCC
>
Meetings
>
2010's
>
2014
>
07/01/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:14:50 PM
Creation date
3/23/2016 8:48:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/01/2014
Meeting Body
Board of County Commissioners
Book and Page
212
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VS.tif
SmeadsoftID
13709
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 6 <br />66th Avenue/ County Road 510 Roadway Widening <br />permit applications. The COUNTY will review the permit applications as <br />necessary. The ENGINEER shall assemble and be responsible for the final <br />submittal. <br />3. The ENGINEER shall prepare permit sketches for submission by the <br />COUNTY to ACOE, and SJRWMD for dredge and fill activities, if necessary. <br />The ENGINEER shall submit all permit sketches on 8" x 11" sheets. Sketches <br />shall be neatly scaled, signed and sealed, and reproducible. <br />4. Environmental evaluations and/or biological summary reports necessary to <br />discern impacts to other surface waters, wetlands and/or endangered species <br />associated with contemplated alignments will be completed, if necessary. <br />Should mitigation plans be required to address delineated impacts a separate <br />agreement with the COUNTY will be provided as an additional service, or the <br />applicable COUNTY Department may design modifications with Department <br />Staff or other consultants. <br />5. Stormwater Design and Permitting will be performed and any cost savings, <br />should the COUNTY enter into a development agreement with adjacent <br />property owners that enables the COUNTY to utilize their lands for the <br />purpose of stormwater attenuation and water quality treatment, shall be passed <br />onto the COUNTY. <br />6. A Stormwater Pollution Prevention Plan (SWPPP) will be developed in <br />conjunction with this project. The site specific SWPPP is a requirement of <br />both the EPA National Pollutant Discharge Elimination System (NPDES) <br />General Permit for Stormwater Discharges from Construction Activities, and <br />the FDEP Generic Permit for Stormwater Discharges from Construction <br />Activities. Note: SJRWMD administers permit for FDEP. <br />G. Signalization Plans <br />Signalization plans will be developed in conjunction with the roadway <br />improvements at the County Road 510/ 66th Avenue intersection. Mast -arm <br />signal configuration will be designed to meet current COUNTY and FDOT <br />standards. <br />Page 3 of 6 <br />80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.