RFP Results <br />The RFP results are summarized as follows: <br />Advertising Date: <br />RFP Opening Date: <br />DemandStar Broadcast to: <br />Specifications Requested by: <br />Replies: <br />May 27, 2014 <br />June 24, 2014 at 2:00 pm <br />274 Subscribers <br />43 Firms <br />3 Firms <br />Proposing Firm <br />Location <br />Huryn Justice General Contractors * <br />Vero Beach <br />Summerlin's Marine Construction, LLC <br />Fort Pierce <br />Underwater Engineering Services, Inc. <br />Fort Pierce <br />*Disqualified — failed to acknowledge Addendum #2 <br />An evaluation committee comprised of the Conservation Lands Manager, Environmental Planning and <br />Code Enforcement Section Chief, Parks Superintendent, Engineering Project Engineer and County <br />Coastal Engineer independently evaluated and scored the proposals in accordance with the Purchasing <br />Manual. These scores were compiled by the committee and an overall ranking of the submittals <br />developed. The committee determined interviews were not necessary. <br />The final ranking established by the committee is as follows: <br />1. Summerlin's Marine Construction, LLC <br />2. Underwater Engineering Services, Inc. <br />This matter is now being presented for the Board to consider approving the evaluation committee's final <br />ranking and authorize staff negotiations with Summerlin's Marine Construction, LLC to conduct the <br />work. <br />ANALYSIS <br />Summerlin's price proposal to complete the dock removal / repair work, including installation of a boat <br />lift for the Sheriff's marine patrol vessel, is $61,099 (the lowest bid received). The cost to complete the <br />repairs without including the boat lift and appurtenances is $51,650. <br />The cost estimate for the subject work under the FIND grant proposal was $25,000 (not including kiosk <br />and educational signage cost). Under the grant, the proposed cost for repair of the main dock ($15,000) <br />was for re -decking (only). Through the RFP process, however, it became apparent that the main dock is in <br />need of structural repair (stringer support and hardware replacement) as well, resulting in a higher cost. <br />Under the FIND grant, the maximum amount the County will receive in grant funds toward the work is <br />$15,000 (including cost -share for the kiosk and signage). As such, if the County elects to proceed with the <br />dock removal/repair/boat lift work, the County's cost is now estimated to be $51,099 for the overall <br />project ($36,099 more than originally estimated under the grant). <br />Based on the costs obtained through the RFP process, the following table reflects revised cost estimates, <br />accounting for the (not -to exceed) $15,000 FIND grant: <br />2 <br />M:\LAACUONES'S PIER\FIND Grant APP 2013\Jones Pier RFP award for dock repair BCC item for 9-I6-14.rtf <br />116 <br />