My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/16/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:08:58 PM
Creation date
3/23/2016 8:52:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/16/2014
Meeting Body
Board of County Commissioners
Book and Page
200
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A5.tif
SmeadsoftID
14150
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Proposal — Renovations to Historic Jones Pier Docks <br />RFP# 2014030 <br />BID SHEET <br />Removal of the North Dock <br />The North Dock shall be removed, including all pilings, trash, debris and other items associated <br />with the dock. Estimated $5,000.00. <br />New Boat Uft <br />Furnish and Install a boat lift on the South Boat Dock (southeast shoreline slip), meeting the <br />following minimum standards: <br />® Include required electrical service to lift - Estimated $1,100.00 <br />® A locking 4 -foot wooden gate should be installed to restrict access to the slip and lift - <br />Estimated $850.00 <br />m lift suitable for 23 -foot Contender Boat, minimum 9,000 Ib. capacity - Furnish 9,000# Hi -Tide <br />Cuda Gear for the sum of $5,599.00 plus $1,900.00 for installation = $7,499.00. This price <br />includes 4 new piling and complete installation of lift. <br />i Include detailed warranty information with your proposal - Included in Bid package. <br />Main Dock Repairs <br />Repair and/or replace all cross pieces and stringers with marine grade #1 lumber - <br />Repair and straighten pilings as needed. Remove pilings (as needed) at the western terminus to <br />accommodate two ADA -accessible boat moorings. Remove and dispose of existing material for <br />the sum of $4,000.00. Replace all new decking, crosspieces and stringers for the sum of <br />$15.00 per square foot. <br />Fish Shack Building: Shore up, stabilize and repair/replace stringers, cross pieces and decking <br />without damaging building. Replace decking around Fish Shack (not inside), shore up <br />underneath with necessary underpinning and 4 new piling for the sum of $2,600.00. <br />Replace all decking with ACQ treated 2"x6" bullnose lumber. <br />Rebuild two benches at the western terminus of the dock (please list this work separately on <br />your cost proposal). Furnish and install 2 new benches for the sum of $550.00 each. <br />Submitters are asked to provide a per item breakdown for work to repair the main dock, due to <br />the unknown nature of repairs needed beneath the Fish Shack. Furnish and install all new <br />decking, crosspieces and stringers including lower area for kayak dock for the sum of $15.00 <br />ATTACHMENT 2 <br />119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.