Laserfiche WebLink
Summerlin's Marine Construction, LLC <br />• Re -deck and repair main dock: <br />• Install boatlift (including electric): <br />• Removal of dilapidated s.f. dock: <br />$46,650 <br />$9,449 <br />$5,000 <br />$61,099* <br />• (* Does not include kiosk and signage; not part of RFP / <br />marine construction work) <br />Project Elements <br />Estimated Cost <br />FIND Cost <br />County Cost <br />Re-deck/repair main dock <br />$46,650 <br />$7,500 <br />$39,150 <br />Install boatlift for marine patrol <br />$9,449 <br />$4,000 <br />$5,449 <br />Remove dilapidated dock <br />$5,000 <br />$1,000 <br />$4,000 <br />Install kiosk/educational signage <br />$5,000 <br />$2,500 <br />$2,500 <br />Total <br />$66,099 <br />$15,000 <br />$51,099 <br />9/ tc/2014 <br />i17 <br />