My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/16/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:08:58 PM
Creation date
3/23/2016 8:52:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/16/2014
Meeting Body
Board of County Commissioners
Book and Page
200
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A5.tif
SmeadsoftID
14150
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MM File #1422 <br />August 25, 2014 <br />NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />"EXHIBIT 1" <br />WORK ORDER NO.7 <br />(Scope of Work) <br />Project Description <br />Masteller & Moler, Inc. (MM) is pleased to present you with Work Order #7 which provides <br />professional engineering services for design and preparation of construction plans, and permitting <br />applications covering the proposed sanitary sewer collection and conveyance project. The project <br />covers the two (2) commercial areas which are part of Study Area #1 covered in the "Sanitary <br />Sewer Feasibility Study and Report for the North Sebastian Area" prepared by Masteller Moler Inc. <br />and dated November 2013. The feasibility study provided the preliminary design of a gravity <br />sanitary sewer collection and conveyance system along with project cost estimates for Study Area <br />#1. <br />Several meetings have been held with the City of Sebastian Staff, the Indian River County Utilities <br />Director, and Masteller & Moler, Inc. during which it was determined that the commercial areas of <br />Study Area #1 should move forward with design, construction plans, and permitting. A project <br />which is "bid ready" will have a greater probability of securing construction grant funding than a <br />project only at the "study" phase. <br />The two (2) commercial areas of Study Area #1 which will be included in this project are generally <br />described as follows: <br />• The commercial area in the unincorporated part of Indian River County along the east side <br />of US Highway #1 from the Sebastian Cemetery north to Bay Street. <br />• The commercial area in the City of Sebastian including North Central Avenue, Jackson <br />Street, Madison Street and Davis Street. <br />Indian River County and the City of Sebastian both recognize the numerous benefits to be gained <br />by the construction of a sanitary sewer gravity collection and conveyance system in these two (2) <br />commercial areas. One benefit of constructing a public sewer system is the elimination of <br />numerous existing and future septic systems which result in pollution of the groundwater table and <br />ultimately pollution of the Indian River Lagoon to the east. Also, in many cases these septic <br />systems represent inconvenience and expense to the users due to their malfunction. The lack of <br />public sewer prevents or limits the orderly growth of commercial development. Since both of these <br />areas included in the project are designated for commercial development, the availability of public <br />sanitary gravity sewer will facilitate the development of these areas. The accelerated commercial <br />development growth will increase employment in the area and provide increased economic activity <br />and stability in the north County and Sebastian area. <br />A brief description of the scope of services for this Work Order is provided below: <br />131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.