Laserfiche WebLink
6.05 Acceptance of Final Payment as Release. <br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate <br />as a release to the OWNER from all claims and all liability to the CONTRACTOR <br />other than claims in stated amounts as may be specifically excepted by the <br />CONTRACTOR for all things done or furnished in connection with the work <br />under this Contract and for every act and neglect of the OWNER and others <br />relating to or arising out of the work. Any payment, however, final or otherwise, <br />shall not release the CONTRACTOR or its sureties from any obligations under <br />the Contract Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, an <br />paragraph 6.20 (Indemnification) of the General Conditions to th <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter in <br />following representations: <br />A. CONTRACTOR has examine <br />other related data identified in t <br />accordance with <br />truction _ tract. <br />iNT 'CR makes the <br />died the Contract Documents and the <br />ents. <br />B. CONTRACTOR has visited the <br />general, local, and S - u ditions t <br />Work. <br />f-miliar with and is satisfied as to the <br />st, progress, and performance of the <br />C. CONTRACT is familiar <br />Regulations fir - <° a affect <br />sfied as to all federal, state, and local Laws and <br />rogre s, and performance of the Work. <br />D. CONTRACTO "'?x <br />pace con• <br />slating to <br />except Undergro <br />ondi "� �jl'� •� <br />ied all: (1) reports of explorations and tests of <br />or c• •'uous to the Site and all drawings of physical conditions <br />ng surface or subsurface structures at or contiguous to the Site <br />Facilities) which have been identified in the Supplementary <br />in paragraph 4.02 of the General Conditions and (2) reports and <br />us Environmental Condition, if any, at the Site which have been <br />pplementary Conditions as provided in paragraph 4.06 of the General <br />en i ied in the <br />Condit' • ns. <br />E. CONTRA OR has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work <br />or which relate to any aspect of the means, methods, techniques, sequences, and <br />procedures of construction to be employed by CONTRACTOR, including applying the <br />specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />00520 - Agreement (Public Works)SAMPLE.doc <br />00520 - 5 <br />F:\Public Works ENGINEERING DIVISION PROJECTS\1137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st St\Admim\agenda items\00520 - Agreement (Public <br />Works)SAMPLE.doc <br />48 <br />