My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/23/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:03:45 PM
Creation date
3/23/2016 8:52:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/23/2014
Meeting Body
Board of County Commissioners
Book and Page
205
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A7.tif
SmeadsoftID
14152
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT AGENDA <br />INDIAN RIVER COUNTY, FLORIDA <br />AGENDA ITEM <br />Assistant County Administrator / <br />Department of General Services <br />Date: September 12, 2014 <br />To: The Honorable Board of County Commissioners <br />Thru: Joseph A. Baird, County Administrator <br />Thru: Michael C. Zito, Assistant County Administrator <br />From: Mike Redstone, Recreation <br />Subject: <br />Approval of Contract and Budget Amendment For Dewatering and Liner <br />Repair Project at the North County Aquatic Center. <br />It is requested that the data herein presented be given formal consideration by the Board of County <br />Commissioners at its regular meeting of September 23, 2014. <br />DESCRIPTION AND CONDITIONS: <br />The North County Aquatic Center was opened on November 30, 2003. It was manufactured by <br />Myrtha Pools Inc., and built by Weller Pools. The competition pool structure has held up well over <br />the years, however; the time has come to do some comprehensive maintenance on different parts of <br />the pool including major repairs to the lining of the pool. One of the main components of this <br />project will be draining approximately 1 million gallons of water from the pool. This essential <br />component of the project will include dewatering around the pool structure to prevent the pool shell <br />from rising out of the ground due to the instability of the surrounding wetland and the unusually <br />high water table. It will require the installation of additional well points that can be utilized for this <br />purpose in the future. <br />ALTERNATIVES AND ANALYSIS: <br />Although Myrtha Pools is the sole source manufacturer of the competition pool, Staff contacted <br />several authorized Myrtha subcontractors as well as independent dewatering companies to obtain <br />pricing on the dewatering portion of the project. Notwithstanding the proposal recommended <br />below, most of the subcontractors or independent dewatering companies were not willing to meet <br />the County's requirement to guaranty the project against the extraction of the pool structure. One <br />estimate, including a warranty against a possible extraction of the pool structure, came in at <br />$200,000. <br />Following this process, Staff aggressively negotiated a settlement under the original warranty <br />which Myrtha originally claimed to be inapplicable, however; the County Recreation Division has <br />worked closely with the County Attorney's Office to negotiate credits under portions of the <br />warranty in dispute resulting a mutually acceptable proposal to complete the repair work through <br />its original authorized installation subcontractor, Weller Pools Inc. at a total cost of $87,561. <br />F:\Assistant County Administrator\AGENDA ITEMS \20I4\BCC 09 SEP 2014\NCAC Competition Pool Repairs - Receation Agenda Item.doc <br />107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.