My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/23/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:03:45 PM
Creation date
3/23/2016 8:52:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/23/2014
Meeting Body
Board of County Commissioners
Book and Page
205
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A7.tif
SmeadsoftID
14152
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In April 2014, a few of the residents along Indian River Drive requested that the BCC move the project <br />to surveying and design phase regardless of the 2/3 in favor of the project. With the direction from <br />the Board staff re-evaluated the same two scenarios mentioned above in the 90% design effort using <br />the survey information. In addition to the survey information soil borings were obtained in May 2014 <br />to evaluate the design. By locating the proposed watermain on the west side of the Drive staff was <br />able to redesign the project to save monies on directional drilling. The current estimate is <br />approximately $46,000.00 less than what was estimated in the planning phase. Although, the new <br />cost per household is $2,820.61 lower for Scenario 1 and $3,846.86 for Scenario 2, Mr. Jernigan, Mr. <br />Jolley and Mr. Franklin have not had success in retaining any additional votes in favor of the water <br />assessment project. <br />The cost and the results breakdown for the two scenarios from the 90% design are as follows: <br />Alternative <br />Project Cost <br />Cost per <br />Parcel <br />Benefitting Parcels <br />Number of <br />Parcels <br />% in Favor <br />Scenario 1: Loop line to Roseland Road <br />(70/30) Split. <br />$ 162,215.00 <br />$ 5,976.34 <br />19 <br />58% <br />Scenario 2: Terminate line at Mr. Franklin <br />Property. (100% Paid by the benefitting <br />properties). <br />$ 99,377.50 <br />$ 5,845.74 <br />17 <br />65% <br />The BCC requested that staff bring the matter back once an updated estimate was given to the <br />residents to collect some additional votes to achieve the 2/3 necessary to move the project forward. <br />ATTACHMENT(s): <br />Indian River Drive Proposed Water Assessment Project Scenario Exhibit <br />APPROVED FOR AGENDA: <br />By:� (Q,oi, %J�'z (I� <br />Jose h A. Baird, County Administrator <br />Date <br />Indian River Co. <br />Ap • • ved <br />Date <br />Administration <br />9,.1 <br />Legal <br />�. <br />/� <br />Budget <br />-/ I 7/4 <br />Utilities <br />Cr, <br />Q 1� <br />Utilities -Finance <br />�� nkc <br />IN <br />F:\Utilities\UTILITY - Engineering\Projects - Assessment Projects\000Assessments - 2012 Proposed\IR Drive - Roseland Rd to Inlet at Sebastian <br />Condos\Agenda Indian River Drive Alternatives Informational Item-9-16-14.doc <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.