Laserfiche WebLink
• <br />• <br />TABLE ES -3 <br />Impacts of Enhanced Recycling on Landfill Construction and Closure <br />Solid Waste Disposal District <br />Indian River County, Florida <br />Construction Project <br />Construction Period <br />with 37 Percent <br />Recycling <br />Construction Period <br />with 50 Percent <br />Recycling <br />Construction Period <br />With 75 Percent <br />Recycling <br />Landfill Disposal Area Expansion <br />Cell 2 <br />FY 2017-18 <br />FY 2017-18 <br />FY 2017-18 <br />Cells 3-4 <br />FY 2023-24 <br />FY 2024-25 <br />FY 2029-30 <br />Cells 5-6 <br />FY 2032-33 <br />FY 2036-37 <br />After FY 2040 <br />Cells 7-8 <br />FY 2036-37 <br />After FY 2040 <br />After FY 2040 <br />Landfill Disposal Area Closure <br />Segment III Phase 1 <br />FY 2023-24 <br />FY 2025-26 <br />FY 2031-32 <br />Segment III Phase 2 <br />FY 2034-35 <br />FY 2039-40 <br />After FY 2040 <br />11. Five -Year Capital Improvements Plan (FY 2015-20) <br />Figure ES -4 depicts the planned or proposed CIP expenditures (in 2014 dollars) <br />during the five-year planning period through FY 2020 to meet the disposal and <br />operational needs of the System. These projects are recommended to reach at least a <br />50% level of waste diversion/recycling in FY 2016. The projects are grouped into <br />solid waste management and Class I landfill projects, C&D landfill closure, ancillary <br />projects, and CCC projects. Ancillary projects include the RFAs, RFIS and RFPs, and <br />small onsite projects to improve recycling (single stream MRF) and citizen access <br />(Small vehicle drop-off and HI -TW facilities). No future improvements to the CCCs, <br />except security upgrades, are recommended. Estimated costs are in FY 2014 dollars <br />Estimated costs included capital cost and engineering costs. The estimated cost for <br />the projects listed in the FY 2015-20 CIP is $14.7 million. <br />12. Long- term Capital Improvements Plan (FY 2021-40) <br />Figure ES -4 tabulates the long term landfill construction projects and closure <br />projects by amount and time frame. The estimated cost for these projects is $23 <br />million. Other ancillary and CCC projects are also shown. <br />kix NEEL—SCHAFFER <br />ES -16 <br />172 <br />