Laserfiche WebLink
• <br />2014 Solid Waste Management Plan <br />2. Conduct a RFA/RFP process for collection services prior to expiration of <br />the current franchise agreements in September 30, 2015. Options to <br />include as a minimum in the RFP are Joint County -municipal contracts, <br />conversion to carted (automated) single stream recycling, conversion to <br />carted (automated) garbage collection, conversion to weekly garbage <br />collection and universal collection in urban service area or entire <br />unincorporated County. (Objective 4 of the Comp Plan has been <br />superseded .by the legislature) <br />3. Advertise RFP for a single stream recyclables processing facility and a <br />C&D processing facility in coordination with the collection system RFP <br />results. (Objective 4 of the Comp Plan has been superseded by the <br />legislature) <br />4. Conduct a RFI for alternate solid waste processing technologies to better <br />define feasible implementable options for waste stream diversion, <br />recovery and recycling. Options could include solid waste processing, <br />waste to energy incineration, pyrolysis and gasification (high <br />temperature catalytic destruction), as well as conventional alternatives <br />including waste transfer to an out -of county processing or landfill <br />facility. Upon determining the most feasible concepts, conduct a RFP to <br />develop a specific detailed waste processing option. (Policy 1.7 and 4.6 of <br />Comp Plan) <br />5. Implement improved collection services from the most feasible options <br />submitted. <br />6. When universal collection is implemented, shut down the Winter Beach, <br />Roseland and Gifford CCCs and scale back operations at Fellsmere and <br />Gifford CCCs. (Comp Plan Policy 4.2 stipulated a mandatory collection <br />study by 2012). <br />7. Construct a citizen's drop-off center at the landfill for use of County <br />residents, and construct a new HHW temporary storage center to replace <br />the outdated facility. <br />8. Construct the 10.6 acre Cell 2 lined disposal unit by early 2019 to provide <br />Class I disposal capacity. <br />Ric NEEL—SCHAFFER <br />ES -19 <br />175 <br />