My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/23/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:03:45 PM
Creation date
3/23/2016 8:52:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/23/2014
Meeting Body
Board of County Commissioners
Book and Page
205
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A7.tif
SmeadsoftID
14152
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Provide the GEOTECHNICAL PROFESSIONAL with all reasonably <br />available drawings, surveys, right-of-way maps, and other documents in <br />the possession of the COUNTY that are pertinent to the project. <br />C. The COUNTY shall be responsible for obtaining only those permits <br />required to perform the work to complete the project, if such permit <br />requirements are made into law and established by regulatory agencies <br />after the effective date of the Work Order. <br />D. The COUNTY shall make all provisions for the GEOTECHNICAL <br />PROFESSIONAL to enter upon public or private property as reasonably <br />required for the GEOTECHNICAL PROFESSIONAL to perform his <br />services. <br />E. The COUNTY shall supply the GEOTECHNICAL PROFESSIONAL with <br />copies of all applicable local codes and regulations. <br />SECTION III — SCOPE OF SERVICES <br />The GEOTECHNICAL PROFESSIONAL agrees to perform all necessary <br />professional geotechnical and testing services and other pertinent services in <br />connection with the assigned project as required and as set forth in the following: <br />A. General <br />1. The GEOTECHNICAL PROFESSIONAL will endeavor not to <br />duplicate any previous work done on any project. Before issuance <br />of a Work Order and written authorization to proceed, the <br />GEOTECHNICAL PROFESSIONAL shall consult with the COUNTY <br />to clarify and define the COUNTY's requirements for the project <br />and review all available data. <br />2. The GEOTECHNICAL PROFESSIONAL shall attend conferences <br />with the COUNTY and its representatives, upon request. <br />3. In order to accomplish the work described under this Agreement <br />under the time frames and conditions set forth in this Agreement, <br />the GEOTECHNICAL PROFESSIONAL shall: <br />a. Complete work on the project within the time allowed by <br />maintaining an adequate staff of registered professional <br />geotechnical engineers and technicians and other <br />employees on the work at all times. <br />b. Comply with all federal, state, and local laws applicable to <br />this project(s). The GEOTECHNICAL PROFESSIONAL <br />work product shall conform with all applicable federal, state <br />and local laws applicable to this project(s). <br />c. The GEOTECHNICAL PROFESSIONAL shall cooperate <br />fully with the COUNTY in order that all phases of the work <br />may be properly scheduled and coordinated. <br />4. All original documents (copy of), survey notes, tracings, and the <br />like, including all items furnished to the GEOTECHNICAL <br />PROFESSIONAL by the COUNTY pursuant to this Agreement, are <br />and shall remain the property of the COUNTY, and shall be <br />delivered to the COUNTY upon completion of the work. <br />2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1349-RFQ 2014007 Geotechnical ServiceslAdmin\Agreements 2014-20151.2014-2016 <br />AGREEMENT ARDAMAN.doc <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.