My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/23/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:03:45 PM
Creation date
3/23/2016 8:52:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/23/2014
Meeting Body
Board of County Commissioners
Book and Page
205
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A7.tif
SmeadsoftID
14152
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />Assistant County Administrator / <br />Department of General Services <br />CONSENT AGENDA <br />To: The Honorable Board of County Commissioners <br />Thru: Joseph A. Baird, County Administrator <br />From: Michael C. Zito, Assistant County Administrator <br />Date: September 10, 2014 <br />Subject: Request for Approval of Change Order #1 to Contract with Duininck, Inc. for <br />Dunes Golf Course Irrigation System Project — Sandridge Golf Course <br />BACKGROUND: <br />'On March 18, 2014, the Board awarded and entered into an agreement with Duininck, Inc. for Bid <br />#2014024 to replace the irrigation system originally installed at the opening of the Sandridge Golf <br />Club in 1987. Following the award, at the preconstruction meeting, the contractor discussed the <br />possibility of needing to adjust the number of sprinkler heads due to the lack of specificity in the <br />original subsurface plans from 1986. As the project was unearthed, the contractor discovered the <br />need to install 23 additional sprinkler head systems and to replace corroded metal piping in the <br />original system. The total cost of Change Order #1 is offered at $12,080 which fraction of this $1.2 <br />million dollar project. No other change orders are anticipated at this time as the project is nearing <br />completion. <br />DESCRIPTION AND CONDITIONS: <br />Duininck, Inc. installed 993 valve -in -head sprinklers and now seeks approval of the additional 23 <br />for a total of 1,016 valve -in -head sprinklers. The connection they were to use was an old metal <br />corroded pipe and the pipe outlet was reduced to a smaller size than what contractor was hooking <br />up to, so it advisable to do this work now and have a clean connection with the correctly sized <br />outlet. The bid documents do not specify to connect to the existing pump above or below ground. <br />The contractor built a new Z configuration so as not to have to rely on trying to connect to existing <br />old and corroded metal pipe. <br />Much of the connection price is to change out an existing bottleneck reducer that was installed <br />when the new pump station was purchased years ago. The existing pump header is 10 inches in <br />diameter and the Z pipe is 12 inches in diameter yet the pump goes from 10 inch to 8 inch then 8 <br />inch to 12 inch with a bottleneck in the middle. Parts were purchased to remove this 8 x 10 <br />bottleneck to make a clean 10 x 12 connection to new Z pipe. The contractor also needs to include <br />a saddle on the new pipe to accommodate the flow meter. <br />The system will be complete with HDPE pipe all the way above ground and will eliminate the very <br />old existing bare metal pipe that is in the ground currently below or at the existing water table. <br />The project, upon completion, is expected to have a useful life of over 30 years. <br />F:\Assistant County Administrator\AGENDA 1TEMS\2014\BCC 09 SEP 2014\BCC Memo - Change Order 1 - Duininck $12,080.00.doc <br />95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.