My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/23/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/23/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:03:45 PM
Creation date
3/23/2016 8:52:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/23/2014
Meeting Body
Board of County Commissioners
Book and Page
205
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A7.tif
SmeadsoftID
14152
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Change Order Form <br />No. 1 <br />DATE OF ISSUANCE: EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR Duininck, Inc. • <br />Project: Dunes Golf Course Irrigation System Project <br />OWNER's Project No.148060 <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Additional Part and Full Circle Sprinklers per Contract and Pump Station Zee Pipe <br />Connection <br />Reason for Change Order: <br />The original design of the irrigation system had 993 valve -in -head sprinklers for the entire <br />property. During installation, there are adjustments that need to be made in order to have <br />proper coverage of water. These additional 23 heads, basically one per hole, will enhance <br />the golf course in certain areas where we didn't have water before. In lieu of coming back <br />later and paying triple the price, it is best to install them now than later because of cost. <br />The connection we were to use was an old metal corroded pipe and the pipe outlet was <br />reduced to a smaller size than what we were hooking up to so it made sense to do this work <br />now rather than later and have a nice, clean connection with the correctly sized outlet. <br />The specification did not specify to connect to existing pump above or below ground. We <br />are building a new Z so we will not have to rely on trying to connect to existing old and <br />corroded metal pipe. <br />Much of the connection price is to change out an existing bottleneck reducer that was <br />installed when the new pump station was purchased years ago. The existing pump header <br />is 10 inches in diameter and the Z pipe is 12 inches in diameter yet the pump goes from 10 <br />inch to 8 inch then 8 inch to 12 inch with a bottleneck in the middle. We also need to <br />include a saddle on the new the pipe to accommodate their flow meter. <br />This way the system is complete and new and HDPE all the way above ground and will <br />eliminate the very old existing bare metal pipe that is in the ground currently and below or in <br />the existing water table. <br />Attachments: (List documents supporting change) <br />Work Order Proposal from Duininck, Inc. <br />Change Order - 1 <br />97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.