My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 2:57:47 PM
Creation date
3/23/2016 8:52:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2014
Meeting Body
Board of County Commissioners
Book and Page
298
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A4.tif
SmeadsoftID
14149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
659
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
199 <br />Melvin Bush <br />Construction, Inc. <br />8 <br />Op <br />8 <br />ri <br />N <br />8 <br />O <br />8 <br />m' <br />N <br />0 <br />0 <br />un <br />N <br />000000o <br />0 <br />1D <br />V► <br />0 <br />n <br />N <br />0 <br />m <br />N <br />0 <br />O <br />N.- <br />N <br />0 <br />..-4N <br />N <br />0 <br />N <br />N <br />-00000000o <br />0 <br />[H <br />1-1 <br />N <br />0 <br />V1 <br />1-1 <br />N <br />0 <br />N <br />V/ <br />0 <br />lC <br />N <br />0 <br />n <br />N <br />0 <br />fT <br />N <br />0 <br />0 <br />a -I <br />N <br />0 <br />r1 <br />H <br />N <br />0 <br />Na <br />,i <br />N <br />0 <br />N <br />N <br />0 <br />0 <br />N <br />m <br />N <br />0 <br />0 <br />(0 <br />m <br />N <br />0 <br />0 <br />00 <br />m <br />N <br />0 <br />0 <br />N <br />0 <br />0 <br />00 <br />a <br />N <br />0 <br />0 <br />N <br />ul <br />N <br />Blue Goose Growers, <br />LLC dlbla Blue Goose <br />Construction <br />$p <br />O <br />ulN <br />N <br />8 <br />O <br />O <br />.? <br />08 <br />a <br />NNNN <br />Vf <br />8'0 <br />IG <br />n <br />gSoin <br />OC <br />N <br />C <br />N <br />N <br />N <br />.1 <br />V? <br />N <br />N <br />V? <br />$13.501 <br />888$8888 <br />Ln <br />NNN <br />n <br />OC <br />VF <br />O <br />.-I <br />V> <br />N <br />ei <br />N <br />f+{ <br />ri <br />N <br />M <br />N <br />Vf <br />0 <br />O <br />a-1 <br />VT <br />0 <br />a(0 <br />ei <br />V! <br />0 <br />ri <br />VF <br />0 <br />00 <br />N <br />N <br />0 <br />a <br />N <br />V} <br />0 <br />0 <br />N <br />V} <br />UNt7 OF <br />MEASURE <br />W <br />W <br />J <br />1 <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />J <br />H.-1 <br />ma <br />n <br />a <br />.-1 <br />N <br />el <br />ri <br />N <br />ri <br />mi <br />ey <br />e-1 <br />ei <br />vi <br />aK <br />ei <br />rf <br />N <br />N <br />a-1 <br />ei <br />.-1 <br />.-4 <br />.-1 <br />.d <br />ei <br />.-i <br />z <br />0 <br />E <br />E <br />u <br />dJ <br />W <br />0 <br />Install Simplex Sewage Grinder Pump Station (ABS <br />Piranha, less than Shp) including connection to <br />electrical, gravlty Inflow and 2" force main to County <br />Receiving Main complete and ready for service <br />Install Duplex Sewage Grinder Pump Station (ABS <br />Piranha, equal or more than Shp) including connection <br />to electrical, gravity inflow and 2" force main to County <br />Receiving Main complete and ready for service <br />Install 2" or 2-1/2" PE Force Main <br />Install 3" PVC Force Main <br />Install 4" PVC Force Main <br />Install 6" PVC Force Main <br />Install 8" PVC Force Main <br />Install 10" PVC Force Main <br />Install 12" PVC Force Main <br />Install 14" PVC Force Main <br />Install 16" PVC Force Main <br />Install 3" DI Force Main <br />Install 4" DI Force Main <br />Install 6" DI Force Main <br />Install 8" DI Force Main <br />.1 G <br />OO <br />LL <br />q❑ <br />ON <br />N <br />(0 <br />N <br />C <br />C <br />.1 <br />LL <br />❑ <br />r1 <br />f0 <br />h <br />E <br />Install 14" DI Force Main <br />1Install 16" DI Force Main <br />Install/Assemble 2" through 4" PVC or DI (Flanged or <br />Push -on) Force Main and Concrete Saddles on Brldge <br />Shelf <br />Install/Assemble 6" PVC or DI (Flanged or Push -on) <br />Force Main and Concrete Saddles on Bridge Shelf <br />Install/Assemble 8" PVC or DI {Flanged or Push -on) <br />Force Maln and Concrete Saddles on Bridge Shelf <br />Install/Assemble 10" PVC or DI (flanged or Push -on) <br />Force Main and Concrete Saddles on Bridge Shelf <br />Install/Assemble 12" PVC or DI {Flanged or Push -on) <br />Force Main and Concrete Saddles on Bridge Shelf <br />Install/Assemble 14" PVC or DI (Flanged or Push -on) <br />Force Main and Concrete Saddles on Bridge shelf <br />WW •0 <br />F Z <br />m <br />� <br />m <br />N <br />m <br />N <br />m <br />N <br />m <br />N <br />m <br />N <br />m <br />N <br />m <br />N N <br />m m <br />N <br />m <br />m <br />m <br />m <br />m <br />m <br />m <br />fcr1 <br />m <br />COm <br />m <br />m <br />m <br />m <br />m <br />m <br />V <br />m <br />u61 <br />cT <br />m <br />a <br />m <br />a <br />m <br />199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.