Laserfiche WebLink
205 <br />Melvin Bush <br />Construction, Inc. <br />e <br />8 <br />H <br />88 <br />N <br />V) <br />.8 <br />4 <br />8 <br />V <br />8 <br />i4 <br />0 <br />Vt <br />8 <br />u <br />�.. <br />VT <br />tp�pp8ul <br />YA <br />N <br />08888" <br />an <br />N <br />in <br />i? <br />in <br />8 <br />t�i1 <br />8 <br />y <br />888 <br />N <br />N. <br />nice!? <br />8 <br />tl <br />i <br />mp <br />V! <br />O <br />s? <br />8 <br />an <br />0 <br />N <br />N <br />Blue Goose Growers, -j <br />LLC dlbla Blue Goose JII <br />Construction <br />p8 <br />Q <br />0 <br />u�j <br />U? <br />O <br />N <br />8 <br />VF <br />O <br />V) <br />00 <br />N <br />h <br />0 <br />.�-1 <br />i1 <br />0 1 <br />N <br />Vt• <br />8 <br />.g-4 <br />VF <br />lD <br />N <br />VF <br />e8 <br />7 <br />2 <br />.�•1 <br />VF <br />8 <br />N <br />VS <br />8 <br />-4 <br />44 <br />1°11 <br />�.-1 <br />44 <br />88 <br />U <br />8, <br />fnA <br />8 <br />MI <br />+n <br />° <br />44 <br />44 <br />8 <br />VY <br />8 <br />VS <br />8 <br />inn <br />8 <br />N <br />_ <br />8 <br />1�/1 <br />8 <br />in <br />Vf <br />N <br />V► <br />ullf <br />lin <br />$80.00 <br />O <br />WI <br />U. <br />m E <br />w <br />w <br />J <br />LL <br />LF <br />LF <br />5 <br />J <br />v) <br />w <br />AS <br />U <br />F' <br />U` <br />N <br />V}f <br />w <br />IA Z <br />MI a <br />rl <br />ri <br />rl <br />ei <br />.-1 <br />ri <br />N <br />.i <br />N <br />H <br />H <br />.-1 <br />.1 <br />c-1 <br />ri <br />e1 <br />ri <br />el <br />ri <br />r1 <br />.i <br />1-1 <br />N <br />.-4 <br />I-1 <br />M <br />ri <br />.1 <br />r1 <br />N <br />z <br />0 <br />P <br />a <br />re <br />0 <br />N <br />W <br />O <br />Install Concrete Saddles on Bridge Shelf for PVC, DI or <br />Steel Aerial Flanged Pipe Construction or Steel Welded <br />Flanged Pipe Placement _- <br />Remove Utility Straps on Aerial Crossing Saddles <br />Install Utility Straps on Aerial Crossing Saddles <br />Remove and Replace Guardrail <br />Remove and Dispose of Concrete Curb & Gutter (All <br />Types) <br />Install -Type '0' Concrete Cement Curb (FOOT Index <br />300) <br />Install -Miami Gutter/ 2' Wide Curb (FOOT Index 300) <br />Install -Type 'F' Concrete Cement Curb (FOOT Index <br />300) <br />Install -Concrete Cement Valley Gutter (FOOT Index <br />1300) <br />Install Gravity Wall (FDOT Index 520) <br />Install Handrail (FOOT Index 520) <br />Remove Brick Paver Driveway <br />install Brick Paver Driveway <br />Remove Concrete Driveway <br />install Concrete Driveway <br />Remove Gravel Driveway <br />Install Gravel Driveway <br />0 <br />co <br />InstaII 4" Concrete Sidewalk <br />Install 6" Concrete Sidewalk _ <br />Tree & Stump Removal & Disposal, Per Inch Diameter, <br />Each Tree <br />Clear and Grub <br />c <br />VX <br />!Load and Haul Debris to Landfill <br />Remove and Properly Dispose of Asbestos Concrete <br />Pipe or Material using Certified Contractor <br />Remove, Properly Store and Properly Dispose of <br />Contaminated Soils, Drilling. Mud, Etc. using Certified <br />Environmental Contractor <br />Lawn Restoration (Topsoil & Sod) Includes Watering <br />Lawn Restoration (Seed and Mulch) Includes Watering <br />'Density Test and Proctor <br />Well Point Dewatering Set Up, Tier Depth up to 25', <br />(Minimum 30' X 30' Work Area) <br />F Z <br />N <br />n <br />M <br />n <br />n <br />V1 <br />n <br />fC <br />n <br />d <br />n <br />u <br />n <br />n <br />N <br />n <br />n <br />n <br />m <br />l` <br />10 <br />n <br />A <br />en <br />r. <br />u <br />on <br />n <br />Oa1Q�t <br />n n <br />Q� <br />Obi �0 <br />n o� <br />O <br />00 <br />.-i <br />00 <br />N <br />au <br />In <br />w <br />et <br />o0 <br />Nin <br />00 <br />00 <br />00 <br />n <br />a0 <br />m <br />00 <br />205 <br />