My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 2:57:47 PM
Creation date
3/23/2016 8:52:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2014
Meeting Body
Board of County Commissioners
Book and Page
298
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A4.tif
SmeadsoftID
14149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
659
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s • <br />CONSENT AGENDA <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />Assistant County Administrator / <br />Department of General Services <br />To: <br />Thru: <br />The Honorable Board of County Commissioners <br />Joseph A. Baird, County Administrator <br />From: Michael C. Zito, Assistant County Administrator <br />Date: August 29, 2014 <br />Subject: Approval of Change Order #1, Stillwater Construction, Inc. for Additional <br />Golf Cart Concrete Path Repairs - IRC Bid No. 2014042 <br />DESCRIPTION AND CONDITIONS: <br />On August 19, 2014, the Board awarded the above referenced bid to Stillwater Construction Inc. <br />The original budgeted amount for this project was $40,000.00. Stillwater Construction's bid came <br />in at $24,320.00, which was over $20,000 below the next lowest responsible bid. This favorable <br />outcome has produced an opportunity to expand the project to include several other areas in need of <br />repair or connection to the cart path system. The contractor is already mobilized on site which adds <br />to the utility of this opportunity to fix areas on the golf course in conjunction with the irrigation <br />system project already in progress. These areas have been problematic for years especially in wet <br />conditions. The scope of work under the change order will permit the golf course to remain open <br />more often during the rainy season. It will allow golf carts to travel through problem areas in some <br />wet conditions when the course might otherwise have to close. Other improvements under the <br />scope of work will increase the interconnectivity of the cart path system according to the master <br />grid. With the addition of the proposed change order in the amount of $14,740, the total cost of the <br />project will increase to $39, 060 which is still under the original amount budgeted for the project. <br />FUNDING: <br />Funding in the amount of $14,740.00 is available in the Golf Course Maintenance, Other <br />Contractual Services Account <br />Account Number <br />Account Description <br />Budget Amount <br />41822172-033490 <br />Golf Course Maintenance - Other Contractual Services <br />$14,740.00 <br />RECOMMENDATION: <br />Staff recommends the Board approve Change Order #1 with Stillwater Construction, Inc. and <br />authorize the Chairman to execute the attached Change Order #1, which has been reviewed by the <br />County Attorney as to form and legal sufficiency. <br />C:\Uscrs\svotzi\AppData\Local1Microsof\Windows\Temporary Internet Files\Content.Outlook\XDFMY9PABCC Memo - Change Order 1 <br />Stillwater Construction for $14740.doc <br />220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.