Laserfiche WebLink
Sandridge Golf Club Concrete Project <br />Change Order #1 <br />Stillwater Construction Inc. <br />1) Hole #1 to #2 <br />2) Hole #5 Walkup <br />3) Hole #7 <br />4) Hole #7 to #8 <br />5) Hole #12 <br />6) Hole #15 <br />7) #9 Curb <br />8) Chipping Green <br />Description: Continuation of Project 1B to connect to the <br />2nd hole which was a dirt path. <br />285 Linear Feet $5,700.00 <br />Description: Replace walkup to bathroom which <br />A wooden bridge and a trip hazard. A lady fell and broke her <br />wrist when she slipped her in 2012. <br />32 Linear Feet $ 640.00 <br />Description: Replace section by tee which was <br />Badly broken concrete and not on original project <br />list. <br />16 Linear Feet $ 320.00 <br />Description: Connect the two holes with path <br />that is normally filled with potholes and a wet <br />mess when heavy rain occur. <br />54 Linear Feet $1,080.00 <br />Description: Extend path from green to make <br />Path for an area that was normally bare and worn from cart <br />traffic. <br />125 Linear Feet $2,500.00 <br />Description: Extend path downhill from tee to improve <br />Drainage of water from the tee that normally washes out the <br />area. <br />100 Linear Feet $2,000.00 <br />Add 8" Curb to path behind green to replace a worn out fence <br />Which served as a barrier so that carts and machinery wouldn't <br />fall into the canal. <br />100 Linear Feet $1,300.00 <br />Replace Curb and add 3' feet of path to increase the width of <br />the area for golf cart traffic. <br />$1.200.00 <br />Total $ 14,740.00 <br />Change Order #1 <br />223 <br />