Laserfiche WebLink
TASK 5.0 - PROJECT QUALITY MANAGEMENT <br />Activities performed under this task consist of those general functions required to maintain the project <br />on schedule, within budget, and that the quality of the work products defined within this scope is <br />consistent with Consultant's standards and the County's expectations. Specific activities included are <br />identified below. <br />Consultant maintains a Quality Management System (QMS) on all projects. Activities performed under <br />this task consist of those general functions required to maintain the project on schedule, within budget, <br />and that the quality of the work products defined within this scope is consistent with Consultant's <br />standards and County's expectations. The Consultant will comply with its QMS, which includes <br />independent review of deliverables, monthly project status reviews, and project close-out activities. <br />OTHER SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES <br />Since design plans and specifications are not yet completed for the AAF project, Consultant will not <br />perform reviews related to specific infrastructure improvements at each crossing beyond reviewing the <br />information available in the EIS. Future services that may be required, but are not included in this scope <br />of services, include but are not limited to: <br />• Easement modifications; <br />■ Right -of -Way acquisition (For SSM implementation); <br />■ Construction, operations or maintenance oversight; <br />• Meetings with FOOT and/or AAF; <br />• Utility conflict identification or resolution; <br />■ Evaluation of County infrastructure Impacts due to proposed track location, proposed rail bridges, <br />proposed elevated track, proposed depressed track, roadway ramp modifications, proposed <br />roadway bridges over rail, proposed stormwater pond locations, and existing stormwater pond <br />relocations and other impacts to existing roadway, bridges, drainage, and ponds; and <br />■ Identification of AAF plan conflicts with long-term roadway build -outs within the County. <br />Other items not included in this Scope of Services are: <br />• Plan review; <br />■ Design assistance; <br />• Cost estimates for SSM implantation; <br />• Utility/infrastructure conflict resolution; and <br />• Application for Quiet Zones. <br />DELIVERABLES <br />• Map the recommended Quiet Zone study area, inclusive of road and rail infrastructure inventory <br />within the study area (Subtask 2.1) <br />• Technical Memorandum of Quiet Zone data analysis, alternatives analysis, and recommended <br />alternatives (Subtask 2.3). <br />• Final report package (Task 3), reflecting feedback and final conclusions and recommendations for <br />the noise monitoring (Task 1) and Quiet Zone study (Task 2). <br />COUNTY RESPONSIBILITIES <br />The County will provide necessary traffic count information for each crossing within the County, as well <br />as assistance/coordination with the City representatives to obtain information for those crossings that <br />QOM <br />mnith <br />A-5 <br />p1536.doc <br />87 <br />