My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/13/2015AP
CBCC
>
Meetings
>
2010's
>
2015
>
01/13/2015AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:07:13 AM
Creation date
3/23/2016 9:10:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/13/2015
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0017-R
Book and Page
282
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005C9.tif
SmeadsoftID
14513
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On-Site Monitoring Visit <br /> Once FDEM personnel have arrived at the site, an orientation conference will be conducted. <br /> During this time, the purpose of the site visit and the items FDEM intends to examine will be <br /> identified. If financial monitoring visit will be conducted, they will then explain their objectives and <br /> will proceed to perform the financial review. <br /> FDEM personnel will review all files and supporting documentation. Once the supporting <br /> documentation has been reviewed, a tour/visual/spot inspection of equipment will be conducted. <br /> Each item should be visually inspected whenever possible. Bigger items(computers, response <br /> vehicles, etc.)should have an asset decal (information/serial number) placed in a prominent <br /> location on each piece of equipment as per recipient agency requirements. The serial number <br /> should correspond with the appropriate receipt to confirm purchase. Photographs should be taken <br /> of the equipment(large capital expenditures in excess of$1,000. per item). <br /> If an item is not available(being used during time of the site visit), the appropriate documentation <br /> must be provided to account for that particular piece of equipment. Once the tour/visual/spot <br /> inspection of equipment has been completed, the FDEM personnel will then conduct an exit <br /> conference with the grantee to review the findings. <br /> Other programmatic issues can be discussed at this time, such as missing quarterly reports, <br /> payment voucher/reimbursement, equipment, questions, etc. <br /> Post Monitoring Visit <br /> FDEM personnel will review the on-site monitoring review worksheets and backup documentation <br /> as a team and discuss the events of the on-site monitoring. <br /> Within 30 calendar days of the site visit, a monitoring report will be generated and sent to the <br /> grantee explaining any issues and corrective actions required or recommendations. Should no <br /> issues or findings be identified, a monitoring report to that effect will be generated and sent to the <br /> grantee. The grantee will submit a Corrective Action Plan within a timeframe as determined by the <br /> FDEM. Noncompliance on behalf of sub-grantees is resolved by management under the terms of <br /> the Sub grant Agreement. <br /> The On-Site Monitoring Worksheets, the monitoring report and all back up documentation will then <br /> be included in the grantee's file. <br /> 53 <br /> 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.