My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/13/2015AP
CBCC
>
Meetings
>
2010's
>
2015
>
01/13/2015AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:07:13 AM
Creation date
3/23/2016 9:10:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/13/2015
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0017-R
Book and Page
282
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005C9.tif
SmeadsoftID
14513
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U N FETCH 'DD <br /> DEC 12 2014 <br /> Timothy Rose Contracting, Inc. <br /> 1360 Old Dixie Highway SW, Suite 106 FNN 1 N RIVER COUNTY <br /> GiNEERING DIVISION <br /> .,, Vero Beach FL 32962 <br /> OO (772) 564 7800 Phone (772) 564 7888 Fax <br /> Q Timrose7(&comcast.net <br /> November 24, 2014 <br /> To: Chris Kafer& Staff <br /> Re: Explanation of Delay of Oslo Roadway Improvements <br /> The issue at hand is the delay of the completion of Oslo Roadway Improvements due to rain. We had nowhere to store <br /> the rain run off except in the proposed west bound lanes. For every one day of rain, it would take two days to recover <br /> because we only had one discharge pipe crossing Oslo Road to the south and that pipe had a large check dam in front of <br /> it. The check dam was wrapped in filter fabric to stop turbid water from entering into Indian River Farms canal. Please <br /> see attached documented rain and recovery days of which total 213. <br /> We were also delayed by utilities relocation under existing Oslo Road which could not be relocated until traffic could be <br /> diverted to newly constructed north lanes because the water main had no working valves from 43`d Ave to Oslo Road. <br /> Therefore to deflect water main, we had to install line stops for multiple days (UT-0762) then install new valves. This <br /> work for water main valves started 12/04/13 and completed on 02/26/14 (also included UT-762 & UT- Final Meeting) for <br /> a total of 85 days. As I aforementioned utilities (FP&L) delays due to conduits not installed per there utility permit issued <br /> by IRC, FP&L had to relocate two main services via directional bore. Comcast also had conduit that were not installed <br /> with enough cover to construct road, we had 2 days of delays for this. We also had delays due to reconfiguring irrigation <br /> and landscape which was 15 days lost. We had to do a directional bore for electrical service to pump address, 4510 9th <br /> Ave SW. There were also work change directives #2 dated April 15th, 2013 which was to realign Oslo from 43`d Ave to <br /> Legend Lakes entrance, which added 60 days to the contract. Work Change Directive #3 was to add 20OLF of underdrain <br /> to allow for more damage, which added 30 more days. Work change directive #4 was to add overbuild existing Oslo <br /> Road from Station 97-15 to 99-00, which caused the road to be reconstructed in this area which added 12 days. Work <br /> change directive #5 was added to accommodate Indian River Farms change in design, caused 30 days to be added. <br /> Work Change directive #6 was also added to accommodate Indian River Farms change in requirements to add ped pipe <br /> to the back of the guard rail, which added 8 days to achieve this. Work Change directives # 8 & 9 did not add or <br /> decrease any days. Work Change directives #11 & 12 were added for wood blocks and special posts to guard rail system <br /> which added 6 days to contract. Work Change directive #13 added joint sealant to bridge joints, this procedure took 21 <br /> days due to waiting on special materials. <br /> To recap: <br /> 200 days rain & recovery <br /> 239 days work change directives and added work <br /> Total: 439 days <br /> Sinc ely <br /> % <br /> Tim Rose <br /> President <br /> Timothy Rose Contracting <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.