My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/13/2015AP
CBCC
>
Meetings
>
2010's
>
2015
>
01/13/2015AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:07:13 AM
Creation date
3/23/2016 9:10:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/13/2015
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0017-R
Book and Page
282
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005C9.tif
SmeadsoftID
14513
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oslo Road Phase III Roadway Improvements <br /> (58th Avenue-43rd Avenue) <br /> Change Order No. 1 <br /> DESCRIPTION OF CHANGES <br /> Item No. Description of Chane I Unit Quan. Unit Price Price Increase Price Decrease <br /> 646-1-11 1 Pedestrain Pedestal 43rd Ave. Ea 1 660.00 660.00 <br /> 653-192 Countdown Ped Signal 2-Way LED 43rd Ave. EA 3 1,040.00 3,120.00 <br /> 706-3 R.P.M.Bi-directional Amber/Amber EA 75 4.00 300.00 <br /> 706-3-2 R.P.M.Bi-directional While/Red EA 89 1 4.00 356.00 <br /> 711-11-122 Thermo lastic Solid Traffic Stripe 8" LF 131 1.00 131.00 <br /> 711-11-123 Thermoplastic Solid Traffic Stripe 12" LF 68 1.50 102.00 <br /> 711-11-141 Thermoplastic Skip Stripe 6"White 6'-10' LF 564 0.61 344.04 <br /> 711-11-141A Thermoplastic Skip Stripe 6"White 10'-30' LF 275 0.30 82.50 <br /> 711-11-170 Thermoplastic While Standard Turn Arrows EA 4 70.00 280.00 <br /> 711-11-221 Thermoplastic Solid Traffic Stripe 6"Yellow LF 1.072 0.75 804.00 <br /> 711-11-221A IThermoplastic Solid Traffic Stripe Double 6"Yellow LF 309 1 1.50 463.50 <br /> 711-11-224 Thermoplastic Solid Traffic Stripe 18"Yellow LF 112 2.50 280.00 <br /> 711-11-241 Thermoplastic Solid Traffic Stripe 6"Yellow 6'-10' LF 55 0.61 33.55 <br /> 630-1-14 Conduit Underground 2"PVC LF 94.55 7.70 728.04 <br /> 639-2-1 IService Wire LF 1 25 1.20 30.00 <br /> 530-3-3 Rock Rubble Canal Excavation&Filter Fabric As Required) TN 107.10 371.00 39 734.10 <br /> FORCEACCOUNT <br /> WCD#2 Remove Existing Curb&Gutter ft Legend Lakes LS 1 8,550.00 8,550.00 <br /> WCD#2 Su er ave Asphaltic Concrete SP-12.5 1.5" SY 75 7.80 585.00 <br /> WCD#2 Su er ave Asphaltic Concrete(SP-12.5)0 5"In Lieu Of Base Group 6 SY 75 25.74 1 1,930.50 <br /> WCD#2 Su er ave Asphaltic Concrete SP-9.5 1" SY 75 5.25 393.75 <br /> WCD#2 Convert Existing Inlet To Manhole LS 1 1,430.00 1,430.00 <br /> WCD#2 Ad'ust Existing Inlet At Sta.99+50 LS 1 600.00 600.00 <br /> WCD#2 Concrete Curb&Gutter(Type F LF 435 9.45 4,110.75 <br /> WCD#2 Concrete Curb (Type D LF 98 9.45 926.10 <br /> WCD#2 Remove&Replace Concrete Driveway At Legend Lakes SY 63 26.92 1,695.96 <br /> WCD#2 Relocate Existing Irrigation LS 1 1,437.50 1,437.50 <br /> WCD#3 Underdrain(6"PVC,Type-2) LF 200 41.50 8.300.00 <br /> WCD#3 Underdrain Inspection Box EA 1 1 257.00 257.00 <br /> WCD#4 Overbuild Oslo Road Area That Could Not Be Reconstructed TN 181.75 100.00 18 175.00 <br /> WCD#4 TemDorary Striping LS 1 1,140.00 1,140.00 <br /> WCD#4 Maintenance Of Traffic LS 1 1 2,236.00 1 2.236.00 <br /> WCD#5 Strain Poles For Canal Bank Stabilization LS 1 1 19 044.00 19 044.00 <br /> WCD#6 Pedestrain Pipe To Back Of Guardrail LF 1.438 9.77 14 049.26 <br /> WCD#7 Truncated Domes At 43rd Ave. LS 1 1680.00 1,680.00 <br /> 42 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD-43rd Ave to 58th Ave-Phase IINAdmim\agenda items\Change Order Form No 1 Oslo Road ph 1119-25-14(2) Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.