My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/06/2015
CBCC
>
Meetings
>
2010's
>
2015
>
01/06/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:40:42 AM
Creation date
3/23/2016 9:22:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Agenda Packet
Meeting Date
01/06/2015
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0017-R
Book and Page
273
Subject
Mediation Update Indian River Shores
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000M\S00060I.tif
SmeadsoftID
14736
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Agenda <br /> INDIAN RIVER COUNTY FLORIDA <br /> J i i r.i <br /> ./i. <br /> DEPARTMENT OF UTILITY SERVICES <br /> Date: December 16, 2014 <br /> To: Joseph A. Baird, County Administrator <br /> From: Vincent Burke, P.E., Director of Utility Services CIP <br /> Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager Aw <br /> Subject: Work Order No.1 with Schulke, Bittle&Stoddard (SBS), L.L.C., for Design, <br /> Procurement and Construction Administration to Rehabilitate the <br /> Headworks at the Central Wastewater Treatment Plant <br /> DESCRIPTIONS AND CONDITIONS: <br /> Indian River County Department of Utility Services (IRCDUS) operates the Central Wastewater <br /> Treatment plant located in Gifford at 3550 491h Street. The expansion to the Central Plant that <br /> included the construction of the headworks was done in 1999. <br /> During a regular pump down of the headworks operations staff noticed that the concrete walls <br /> just above the water level, had extensive deterioration. <br /> ANALYSIS: <br /> In August, 2014, staff requested SBS to submit a proposal to remedy the failing concrete at the <br /> headworks. SBS as part of their evaluation in preparing the proposal performed a site visit. <br /> During that visit SBS and IRC staff noticed the extensive spalling of the concrete where in some <br /> areas chunks of concrete were missing exposing the rebar. <br /> Per the CCNA procument guidelines SBS submitted a proposal for design, bidding assistance <br /> and construction management services. Schulke, Bittle & Stoddard, L.L.C., has submitted Work <br /> Order No.1 which includes providing professional services for design, specifications/bid <br /> documents, and construction observation to rehabilitate the headworks at the Central <br /> Wastewater Treatment Plant. The total negotiated cost for the professional services is a sum <br /> amount of$ 15,500.00. The negotiated cost has been broken into different tasks. <br /> The Engineers estimated construction cost for these improvements covered in the Scope of <br /> Work for Work Order No. 1 will be approximately $152,000.00. <br /> FUNDING: <br /> Funds for this project are derived from the renewal and replacement budget in the operating <br /> fund. Operating funds are generated from water and sewer revenues. <br /> 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.