Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM Ile <br /> TO: Joseph A. Baird, County Administrator <br /> r... THROUGH: Christopher R. Mora, P.E., Public Works Director <br /> FROM: Christopher J. Kafer, Jr., P.E., County Engine <br /> SUBJECT: F.D.O.T. Small County Outreach Program (SCOP) Agreement— <br /> Amendment No. 2 and Resolution Authorizing the Chairman's Signature <br /> Construction (Reconstruction) of Old Dixie Highway from IRFWCD North <br /> Relief Canal to 71St Street <br /> FM No. 429566-1-58-01 IRC Project No. 1137 <br /> DATE: December 10, 2014 <br /> DESCRIPTION AND CONDITIONS <br /> On September 30, 2013, the Board of County Commissioners entered into a Small County <br /> Outreach Program (SCOP) Agreement FM No. 429566-1-58-01 with the Florida Department of <br /> Transportation (FDOT) for construction (reconstruction) of Old Dixie Highway from Indian River <br /> Farms Water Canal District(IRFWCD) North Relief Canal to 711t Street for a total estimated project <br /> cost of$1,900,000.00 (75% FDOT funding in the amount of$1,425,000.00 with the County's cost <br /> share of 25%or$475,000.00). Amendment No. 1 to the SCOP Agreement, dated June 12, 2014, <br /> added a twelve-foot wide left turn lane to the scope of work that will service the North County <br /> Charter School which is located north of 65th Street and will be funded by a Developer's Agreement <br /> between Indian River County and North County Charger School in the amount of$48,927.00. <br /> On September 16, 2014,Timothy Rose Contracting, Inc. was awarded the bid for this project, in <br /> the amount of $1,792,422.35, which includes $132,551.76 not being funded by the FDOT (this <br /> amount includes the additional turn lane for the North County Charter School, as well as a force <br /> account for unforeseen items that may occur in the field). Construction Engineering Inspection <br /> (CEI) will be funded by the FDOT in the amount of$51,451.68. <br /> The Florida Department of Transportation (FDOT) has requested Indian River County execute and <br /> deliver to the FDOT the attached Amendment No. 2 to the Agreement to decrease SCOP funding <br /> in the amount of $188,677.73 as a result of the approved bid amount. Staff agrees with the <br /> decrease of SCOP funding. Also attached, please find a Resolution authorizing the Board of <br /> County Commissioners to execute this Small County Outreach Program Agreement Amendment <br /> No. 2 for SCOP Contract No.AR-620(FM#429566-1-58-01)decreasing the grant by$188,677.73, <br /> for a total project cost of$1,711,322.27. <br /> FUNDING <br /> Funding for this project is budgeted and available from Secondary Roads, Gas Tax, Account No. <br /> 10921441-053360-12008,Old Dixie Resurfacing(North Relief Canal—711t Street)in the amount of <br /> $427,830.57 and from FDOT SCOP grant Contract No. AR-620 in the amount of$1,283,491.70. <br /> F:\Public WorksTNGINEERING DIVISION PROJECTS\I 137-Old Dixie Hwy Resurfacing IRF North Relief Canal to 71st St\Admim\agenda 63 <br /> items\BCC Agenda Memo for Amendment No.2 1-6-2015.doc <br />