Laserfiche WebLink
I <br /> Indian River County Department of Utilities <br /> LABOR AND MATERIALS COST ESTIMATE USING LABOR CONTRACT <br /> 107th Avenue 12"Master Plan <br /> Transmission Water Main Loop in Vero <br /> Pml«t: Lakes Estates <br /> Da t: 1013/2014;Rertxd 11-14-14;Reiiwd 17-413 <br /> LABOR COST MATERIALS <br /> Bid Bid Item ] Estimated unit or Labor Unit Total Labor Material Unit Total Material <br /> Item No. Descriptio. ...tit, Me.s.re Price Price Price Price <br /> 91 Mobilisation.Demobilization.MOT 101/ % 0.10 SIS 946.25 <br /> 0tr Install 12"PVC Water Main 6'500 LF $10.00 565,0(10.00 SI9.06 $117,390.0(1 <br /> 09c Install 12"HDPE Directional Bore Including MJ 300 <br /> Adaptors and Fusion of Pipe LF 566.00 519.800.00 $26,43 $7.929.00 <br /> 19c Install 12"NRS Resilient Seated Gate Vakc <br /> Bos 12 EA S2S000 530011.00 $1,187.23 $1424676 <br /> Install 8"PVC Water Main 2S0 LF $9.00 12,000.00 $8.52 $2.130.00 <br /> Install R"Resilient Seated Gate Valve&Bos 15 EA $200.00 53000.00 5619.11 $9.296.65 <br /> 20B Install New Fire H7drant Aa,—bly w/SS Wet I ip <br /> W/6"Ta i Valve&Sleeve 6 EA $2.000.00 $12.000.00 S1291.49 S7,748.94 <br /> 09 Install Mechanical Res"itied Joint DI Finings 4 TON S4.100.00 SI6400.00 $4.100.00 516,400.00 <br /> 23 Test Holm/Potholes 14 EA. $250.00 $3.500.00 <br /> Fill,pressure test chlorinate and(lush water main. <br /> 29b 10"throe 16" 6,800 LF 52.00 513.600.00 <br /> Install Sample Point per Count,Detail.Remove R EA S275.00 $500.00 <br /> 306 afttt FDEP Clearance 52.200.00 <br /> 30c Take Bacterin[Sample,Deliver to Lab for Testing 14 5150.00 $2.10000 <br /> Lmvn Restoration(Topsoil and Sod)Includes 7.050 SY SL25 52.50 <br /> 86. Watering <br /> $IS R62SO $17.625011 <br /> Subtotal Subtotal Water Swtcm Labor 5159.462.50 5192.8635 <br /> Subtaal Submtal Water SSslem Labor.Mob..Dcnwb.. <br /> MOT Materials,&Pennittin1 $174.308.75 <br /> Force Accra. IRCDUS Contingency Account I EA 0 10 $17.430.88 519.275.63 <br /> Subtotal Subtotal Water Ststem Lab.&Contin cote $191.739.63 5212,031.99 <br /> Bond Public Construction Bond 4 $7.669.59 <br /> S aM1Totnl 5199,309.21 5212,03199 <br /> TOTAL 5411441.10 <br /> ATTACHMENT 4 <br />