The Contractor is responsible for obtaining a County Public Works Engineering Division right-of-way <br /> permit. The Contractor shall also submit a Traffic Control Plan to the County Public Works Traffic <br /> �" Engineering Division a minimum of 72 hours prior to construction and notify County Traffic Engineering a <br /> minimum of 24 hours before any lane closures. A temporary access plan shall be provided indicating how <br /> local traffic will be maintained while the existing road is removed and reconstructed. Stand mounted Advance <br /> Construction signing shall be installed in accordance with FDOT Index 602. One lane closures shall be in <br /> accordance with FDOT Index 603. When any work encroaches the area between the centerline and two (2) <br /> feet outside the edge of pavement, traffic shall be restricted to a single lane. <br /> ARTICLE 2 ENGINEER <br /> 2.1. The project has been designed by Gordon E. Sparks, P.E., hereinafter called <br /> ENGINEER, and who is to act as OWNER'S representative, assume all duties and responsibilities <br /> and have the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with completion of the work in accordance with the Contract Documents. <br /> ARTICLE 3 THE PROJECT, TERM AND CONTRACT TIMES <br /> 2.01 The Project for which the Work under the Contract Documents may be generally described as follows: <br /> Project Name: 12"Transmission Water Main Extension on 107th Avenue in Vero Lake Estates <br /> Bid Number: 2015017 <br /> Project Address: Vero Lake Estates, 106th Ave., 94th St., 107th Ave.,891h St. <br /> The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall complete <br /> the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be utilized in <br /> the job. <br /> 3. Perform all photographic recording and documentation of conditions prior to <br /> construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Submit and secure approval of shop drawings. <br /> 6. Mobilize all labor, equipment, and materials. <br /> 7. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> (b) From 31 calendar days to 90 calendar days from the effective date of Notice to Proceed, the <br /> CONTRACTOR shall complete the following tasks: <br /> 1. Install all pipe and appurtenant items. <br /> 2. Perform all testing. <br /> 3. Restore all disturbed areas to their pre-construction condition. <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial <br /> Completion. <br /> (c) From 91 calendar days to 120 calendar days from the effective date of Notice to Proceed, <br /> the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 00530-2 <br /> 76 <br />