VLE 12'Waterh� 3sion on 107th Avenue
<br /> etre .r 2015017
<br /> BLd Tabulation
<br /> EST. UNR Blue Goose Growers,
<br /> ITEM OF TB Landmark Sunshine Land Design Timothy Rose Johnson Davis Inc. TrlSure Corporation LLC dibla Blue Goose Andrew$Rework Don Luchetti
<br />Go Underground Utilities
<br /> NO. DESCRIPTION AUANTI MEASU Construction 9 Contracting Construction
<br /> TY RE Constnsction
<br /> TOTALUNIT PRIMP TOTAL UNIT TOTAL UNIT PRICE T TOTAL, TOT I A
<br /> 1 1-,,12'PVC-ter Main 6,500 LF $63.00 $409500.00 $40.89 $265,785.00 $46.00 S299,ODMOD $4100 5266,500.00 $29.OD $188,500.00 $46SO $304,200.00
<br />SS3.00 5344,500.00 $53.00 $344,500.00 $52.00 $338,000.00
<br /> 2 hlstaD 32•HDPE Directional Bore Induding 300 LF $120.00 $36,000.00 $98.60 $29580.00 $125.00 $37,500.00 $125.00 $37,500.00 $65.00 $19,500.00 $117.15
<br /> $35,145.00 $77.00 $23,100.00 S10L00 $30,300.00 $70.00 521,000.00
<br /> Fasten of Ml and Pipe
<br /> 3 (Install 12'Resilient Seated Gate Valve an! 12 EA $3,230.00 $38,760.00 $3,009.18 $36,110.16 $2,929.00 $35,148.00 $2,400.00 $28,800.00 $L700.00 $20,400.00
<br /> $2,129.00 $25548.00 $2,783.00 $33,396.00 $3,085.00 $37,020.00 $2,650.00 $31,800.00
<br /> x 1
<br /> 4 IrejaD 8'PVC Water Main 250 LF 58000 S20=00 $28.20 57,050.00 $25,00 S6 25000 $4SOO SiL250.00 52(100 S5=00 53375 SSA3750 538.00 S95WOD
<br /> moo $7,000.00 $3800 59,500.00
<br /> S (Int all 8•Resilient Seated Gave Valve and 155 EA $ZODD.00 $30,000.00 $1,948,52 $29,227.90 $1,827.00 $27,405.00 $1,500.00 $22,500.00 $ • .00 $22,500.00
<br /> $1,179.00 $17,685.00 $1,600.00 $24,000.00 $1,972.00 $29,580.00 $1,200.00 1 $18,000.00
<br /> Box
<br /> 6 Imte"New Fre Hydrant Assembly with 6• 6 EA $5,800.00 534,800.00 55,938.10 $35,628.60 55,400.00 $32A00.00 $5,000.00 $30,OOD.00 $5500.00 $33,000.00 $3,502.00
<br /> $21,012.00 55,699.00 $34,194.00 $5,715.00 $34,290.00 53,500.00 $21,000.00
<br /> Gate Valve and Boa
<br /> 7 Lawn Restoration(Topsoil and Sod) 7,050 LF $3.00 $21,150.00 $4.44 $31,302.00 $3.84 527,072.013 $4.00 $28,200.00 $L90 $10575.00 $3.80
<br /> $26,790.00 $7.24 $51,042.00 $2.25 $15,862.50 $2.50 $17,625.00
<br /> Includes Wsterh
<br /> 8 Public Construction Bond 1 LS $7,72500 $7,725.00 $10,00000 $10,00000 $5,14072 $5,140.72 $7,50000 $7,50000 $13,500.00 $13500.00 $6,155,00 $6,155.00
<br /> $16,042.00 $16,042.00 $8,31000 $8,310.00 $15,000.00 $15,000.00
<br /> 9 Clearing in the Right-of Way(Water Main 1 Acre $2,750.00 $2,750.00 $9,046.14 $9,046.14 $6,500.00 56,50000 $5,000.00 $5,000.00 $18,000.00 $18,000.00
<br />$6500.00 $6,500.00 58,050.00 58,050.00 $1L525.00 511,525.00 $8,000.00 $8,000.00
<br /> Side Only
<br /> SUBTOTAL OF BID ITEMS 1-9 ABOVE $6001685.00 $453,729.70 $476,415.72 $437,750.00 $330,975.00 $451,472.50 $543,824.00 $518,387.50 $479,925.00
<br /> 10 Mobilization,Demobilization,MOT 1 LS $30,OOD.00 $30,000.00 $9,946.13 $9,946.13 $15,000.00 $15,000.00 $10,000.00 510,00000 $15,000.00 $15,000.00 $15,000.00
<br /> $15,000.00 $25,917.00 $25,917.00 $29,800.00 $29,8130.00 $15,000.00 $15,000.00
<br /> SUBTOTAL OF BID ITEMS 1.10 ABOVE $630,685.00 $463,675.83 $491,415.72 $447,250.00 $345,975.00 $466,472.50 $569,741.00 $548,187.50 $494,925.00
<br /> FORCE ACCOUNT $35,000.00 $35,000.00 $35,000.00 $35000.00 $35000.00 $35,000.00 $35,000.00 $35,000.00 $35000.00
<br /> TOTAL BID AMOUNT $665,695.00 $498,675.83 $526,415.72 S434251100 $380,97S.00 $501 47230 $604,741.00 $583 187.50 $529 925.00
<br /> Note:Go Underground's entry for Mobitlization,Demobilization and MOT Attachment 2
<br /> exceeded the max.allowable amount of$15,000 based on their subtotal
<br /> being less than$500,000.
<br /> 003163
<br />
|