Laserfiche WebLink
January 6, 2015 <br />Timothy Rose Contracting, Inc. <br />1360 Old Dixie Highway SW, Suite 106 <br />Vero Beach FL 32962 <br />(772) 564 7800 Phone (772) 564 7888 Fax <br />Tim rose7(dcomcast.net <br />Mr. Chip Boyette <br />Indian River County <br />180127 1h Street <br />Vero Beach FL 32960 <br />Re: 12th Street & 27th Ave Intersection Improvements <br />Dear Mr. Boyette, <br />Chip, as you are aware, we had delays on this project due to AT&Ts lack of knowing where and what <br />there cables were. Once we exposed AT&T cables/conduit, we determined that the only way to get under <br />cables/conduit was to add two type H structures, one on either side of 27th Ave. We also had to change <br />pipe from round to elliptical so we could get under AT&T. There was an additional 14 days lost due to <br />procurement and installation. We were also delayed at 29th Ave waiting on AT&T and FP&L to bore and <br />splice where cables were in conflict with installation of 60" RCP, which caused 14 days of delay. Again we <br />had delays due to AT&T at the east end of project. There was a 50 pair cable in conflict with under drain <br />and riprap, which delayed us another 6 days. <br />We also had several rain events that ceased our operation, due to several ditches from north and south <br />that drained directly into our pipe. On November 20th, we received 2.59" of rain and on November 21St, <br />4.23" of rain before the area had drained, we received another 1.5" of rain on December 1st. Due to <br />these major rain events we could not begin installing 60" RCP east of 27th Ave until December 51h, 2013, <br />of which was a total of 12 days delayed, due to 3 rain events. On January 15t 2014, we received 0.75" of <br />rain which stopped RCP installation again until January 61h, in which 4 more days delayed. Another rain <br />event was on January 29th, we got 0.50" and January 30th, we got 0.83" of rain where 5 days were lost. <br />On February 12th, we received 0.75" of rain, in which we were delayed 1 day again and on February 21 <br />we received 0.50" again we were delayed another day. <br />The total days delayed were 57 days which would extend final completion date from April 27th to June <br />24th. <br />Total of 57 days lost due to rain and AT&T. <br />Sincerely <br />Timothy Rose <br />President, Timothy Rose Contracting <br />151 <br />