My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/10/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
02/10/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:51:53 AM
Creation date
3/23/2016 9:13:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Added Agenda Item
Meeting Date
02/10/2015
Meeting Body
Board of County Commissioners
Book and Page
157
Subject
Custodial Svcs County Bldg
Agenda Packet B
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000J\S0005FC.tif
SmeadsoftID
14620
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA n' <br />MEMORANDUM 1 v <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />FROM: Christopher J. Kafer, Jr., P.E., County Engineer <br />SUBJECT: Work Order No. 1, MBV Engineering, Inc. <br />East Gifford Drainage (411t Street to 43rd Street) <br />IRC Project No. 1502 <br />DATE: January 28, 2015 <br />DESCRIPTION AND CONDITIONS <br />On November 15, 2011, the Board of County Commissioners approved the Continuing Contract <br />for Professional Services with MBV Engineering, Inc. and on November 4, 2014, approved an <br />Extension and Amendment of the Continuing Contract. <br />The purpose of Work Order No. 1 is to provide Stormwater improvements in the historic Spruce <br />Park subdivision located in the Gifford area of Indian River County. The area of focus is a <br />residential contributing basin comprised of approximately 40 homes bordered by 4111 Street to <br />the south, 43rd Street to the north, the Florida East Coast Railroad to the east and 28th Avenue <br />to the west. The neighborhood is currently underutilizing an available wet detention treatment <br />facility due to the lack of a modern conveyance system. <br />The proposed design improvements will consist of conveyance swales, culverts, and Stormwater <br />structures within the County right of way and previously attained drainage easements. MBV <br />Engineering, Inc. will provide the surveying, design, permitting and bidding services related to <br />the above activities for a lump sum amount of $54,400.00. <br />The design of this drainage improvement will be combined with the design of the West <br />Wabasso Sewer Phase II project and submitted as one application for a Community <br />Development Block Grant (up to $750,000.00). <br />FUNDING <br />Funding is budgeted in Account No. 31524319-066340-15017, Optional Sales Tax, East Gifford <br />Drainage, in the amount of $54,400.00. <br />159 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1502-E Gifford Drainage -41st St to 43rd SI\Ndmin\agenda items\BCC Agenda MBV Work Order No <br />I .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.