Laserfiche WebLink
SECTION 00942 - Change Order Form <br />No. 1 <br />DATE OF ISSUANCE: EFFECTIVE DATE.- <br />OWNER: <br />ATE: <br />OWNER: Indian River Countv <br />CONTRACTOR: Bayshore Construction, Inc. <br />Bid No.: 2014029 <br />Project: LAGOON GREENWAY PHASE 2B BOARDWALK & OVERLOOK <br />OWNER's Proj. # IR -12-53 <br />This Change Order authorizes the following changes in the Contract Documents for the Lagoon <br />Greenway Phase 2B Construction Agreement: <br />Description: <br />Change Order No.1 is to account for an additional 20 linear feet of wetland boardwalk <br />needed to traverse the mangrove impoundment, beyond the estimated 1,140 linear feet <br />specified in the original contract, and to account for an additional 116 linear feet of ADA <br />hand railings to meet building code requirements. <br />Reason for Change Order: <br />• Actual linear footage of wetland boardwalk needed to traverse mangrove <br />impoundment vs. linear footage estimated in bid contract agreement. <br />• Actual linear footage of ADA hand railings to meet building code requirements vs. <br />linear footage estimated in bid contract agreement. <br />Attachment: (List documents supporting change) <br />Bayshore Construction, Inc. December 22, 2014 correspondence with <br />cost for additional 20 <br />linear feet of boardwalk and 116 linear feet of ADA railings. <br />CHANGE IN CONTRACT PRICE: <br />Description <br />Amount <br />Original Contract Price <br />$278,393.91 <br />Net Increase of this Change Order: I <br />$6,452.00 <br />Contract Price with all approved Change Orders: <br />$284,845.91 <br />ACCEPTED <br />By: <br />CONTRAC b&gn�ature) <br />Date: <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: Approved by the BCC / /15 <br />ATTACHMENT, <br />199 <br />00942- 1 <br />M:\LAAC\Flinn Tract aka Lagoon Greenway\FIND Grant App Phase B\Bayshore Construction Contract Change Order 1.doc <br />