Intergenerational Recreation Center Page-4- <br /> AACE Proposal No.P14-392 <br /> Site Work Testing <br /> Mass Site Fill Density Testing; <br /> ► 360,000 ft'of filled area x 4 ft.of fill(+ 1'Natural Ground)x 1 test/5,000 ft' <br /> =360 In-Place Density Tests @$23.00/test .. ...... ....... ...... . . . .. .. .. .. .... .. ..... .... $8,280.00 <br /> Parking Lots.Entrance Roadway,access Drive and Curb Pad(top 1'of embankment+subgrade+base): <br /> P. 140,000 fe x 1 test/5,000 ft'x 3 test/location;Assume 100 In-Place Density Tests @$23.00/test ... $2,300.00 <br /> Stormdrain System(_Piping+ Structures): <br /> ► Stormdrain Structure Backfill Testing=150 In-Place Density Tests @$23.00/test .. .. ... .... .... $3,450.00 <br /> ► Stormdrain Piping Backfill Testing=130 In-Place Density Tests @$23.00/test.. .... .... ........ $2,990.00 <br /> SanitaU SewerP(_pi ing+Manholes): <br /> ► 90 In-Place Density Tests @$23.00/test ..... .. .. .. . .......... .. .. .... .. .. . . . .. ....... .... $2,070.00 <br /> Water Line and Fire Main: <br /> M. 40 In-Place Density Tests @$23.00/test ... . . . . .... . . .... .... . .. .. .. .. . . .. .. . .. ... .... .... . $920.00 <br /> Miscellaneous Tie-ins,Valves,Hydrants.Conflicts,etc. <br /> ► 25 In-Place Density Tests @$23.00/test ... . . . . .... . . . ... .. ... .. .. .... ... . . .... ... .... .. .. . $575.00 <br /> Laboratory Testing: <br /> ► LBRs(parking lot and roadway subgrade and base rock);6 tests @$295.00/test .. .... ... ........ $1,770.00 <br /> ► Proctor Tests;8 tests @$85.00/test . ...... . .. ... .. . . ... ... . ... .. .. .. .. .. . . ...... .. .. .... . $680.00 <br /> Concrete Testing: <br /> ► Sidewalks and Curbing: <br /> 10 sets of 4-cylinder concrete specimen(tested at 7,28,28 days and Hold) <br /> @$85.00/set[$55.00/hour/technician charged for time spent beyond 1 hour <br /> per scheduled set of cylinders made]. ..... .. .. . ... .. .. ...... .... .. .. .... .. . . . .. ... .... .... . $850.00 <br /> Misc.Man-hours: <br /> We have included limited man-hours that may be necessary during standby during deflections, LBR/Proctor Sampling, <br /> subgrade inspections,field meetings,roadway restorations(i.e.,15''Street SW),etc. <br /> ► Senior Project Engineer;3 hrs./week x 52 weeks x$110.00/hr. .. .... .. ............ .. . ..... .. $17,160.00 <br /> ► Senior Field Technician;3 hrs./week x 52 weeks x$55.00/hr. ......... . .... . ... .. .. .. ..... .... $8,580.00 <br /> ► Technical Secretary;25 hours x$45.00/hr. .. .. .. .... . . ....... .... . . .. ...... .. .. .. ......... $1,125.00 <br /> Site Work Testing Subtotal: . $50,750.00 <br /> 99 <br />