My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/10/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
02/10/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:55:08 AM
Creation date
3/23/2016 9:13:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/10/2015
Meeting Body
Board of County Commissioners
Book and Page
140
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000J\S0005FD.tif
SmeadsoftID
14621
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intergenerational Recreation Center Page-6- <br /> AACE Proposal No.P14-392 <br /> The following conditions apply to this project: <br /> (1) A minimum of 4 density tests or 1 set of concrete testing will need to be performed per hour,per visit to the site. <br /> (2) Stand-by time will be charged at$55.00/hour per technician. <br /> (3) We note that density testing frequencies are approximate and based on our experience with similar projects and <br /> anticipated contractor methodologies. Allowances for re-tests(from failing density tests)are not included herein. <br /> (4) The contractor should contact Andersen Andre Consulting Engineers,Inc.at(772) 807-9191 a minimum of 24 <br /> hours prior to any testing and 48 hours prior to weekend and evening work. <br /> (5) Unit rates apply to standard working days,Monday through Friday,7:00 a.m to 6:00 p.m. Testing and hourly rates <br /> will be increased by 50%for weekend,holiday or after-hours services. <br /> (6) The following testing costs are not included within this estimate:costs associated with asphalt testing(either in the <br /> field or laboratory)or bacteriological testing of potable water(bac-t's). Such testing can be performed if requested <br /> using the rates included herein. <br /> (7) If our testing estimate for a specific work element is insufficient for that particular activity,resources from another <br /> work element can be used without prior authorization from the client as long as our total cost estimate is not <br /> exceeded. We will notify you in advance if it appears that the cost estimate presented in the attached unit fee <br /> schedule will be exceeded. <br /> (8) Soil sample pickup for laboratory testing(e.g.,Proctor testing)will be billed at$55.00/hour if not scheduled with <br /> other work. <br /> (9) We note that the number of sets of concrete cylinders is dependent on numerous factors,such as the size and <br /> duration of pours. For example,if numerous"smaller"pours(e.g.,10-yard pours)occur during construction,our <br /> estimate for the number of sets of concrete cylinders may be exceeded,thus requiring revision of this proposal to <br /> account for this testing cost increase. - - <br /> (10)No paint-thickness or fire proofing thickness testing,bolt-tightness,steel or weld inspections,or floor levelness <br /> testing are included herein;we would be pleased to revise this proposal to include such services if requested. <br /> 101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.