My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2013
CBCC
>
Meetings
>
2010's
>
2013
>
03/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 1:48:20 PM
Creation date
3/23/2016 9:15:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Book and Page
158
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005JM.tif
SmeadsoftID
14664
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM ge <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />Christopher J. Kafer, Jr., P.E., County Engineer <br />FROM: Michael D. Nixon, P.E., Roadway Production Manager 141 <br />SUBJECT: Work Order No. 1 with Ardaman and Associates, Inc. for Professional <br />Geotechnical Services for 43`d Avenue and SR 60 Intersection Improvements <br />(18th Street to 26th Street) IRC Project No. 0853 <br />DATE: February 20, 2015 <br />DESCRIPTION AND CONDITIONS <br />On September 23, 2014, the Board of County Commissioners approved an annual agreement <br />for Professional Geotechnical Services, with Ardaman and Associates, Inc. for various <br />geotechnical services for Indian River County. <br />The purpose of Work Order No. 1 is to provide contamination assessment services for the right- <br />of-way acquisition and construction of 4311 Avenue and SR 60 Intersection Improvements. The <br />Florida Department of Transportation (FDOT) is purchasing the necessary right-of-way to <br />improve the intersection of 43rd Avenue and SR 60 and requires a contamination assessment <br />report to finalize the right-of-way acquisition prior to construction. Ardaman and Associates, <br />Inc. performed a Preliminary Contamination Assessment, Level II, identifying various <br />contaminated sites within the project area. The FDOT is now requiring a Level III Contamination <br />Assessment. This will include 40 monitoring wells to be installed outside of the right-of-way. <br />The report will include the results of the findings relative to any identified soil and ground water <br />contamination that may present limitations, require special monitoring, or special treatment <br />during construction. <br />Ardaman and Associates, Inc. has submitted a proposal outlined in the attached Work Order <br />No. 1 and Proposal for a Level III Contamination Assessment Services (Exhibit A) for a not -to - <br />exceed amount of $59,000.00. Services will be performed on an as needed basis and payment <br />will be in accordance with the fee schedule attached as part of Exhibit A. <br />W, <br />F \Public Works\ENGINEERING DIVISION PROJECTS\0853-43rd AVE 18th ST to 261h ST (Arcadis)\Admim\agenda items\BCC Agenda ARDAMAN, WO 1, 3.10-15.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.