Laserfiche WebLink
CLIENT: <br />PROJECT: <br />DESCRIPTION: <br />TOTAL ESTIMATED PROJECT COST: <br />Indian River County <br />State Road 60 and 43rd Avenue Intersection Improvements <br />Level 3 Contamination Assessment <br />$59,000.00 <br />ITEM DESCRIPTION <br />UNITS <br />NUM13EI <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION <br />ITEM DESCRIPTION <br />UNITS <br />NUMBE <br />UNITS <br />T PER <br />UNIT <br />EXTENSION <br />PERSONNEL <br />GENERAL FIELD EQUIPMENT AND EXPENDABLES <br />Senior Project Engineer <br />Per Hour <br />60 <br />$115.00 <br />$9,200.00 <br />Proqect Engineer <br />Per Hour <br />15 <br />$95.00 <br />$1,425.00 <br />Staff Engineer <br />Per Hour <br />$85.00 <br />Generator <br />Per Day <br />5 <br />$95.00 <br />$475.6-0 <br />Mobilization of ConceRe Coring Equipment <br />Per Tri <br />5 <br />$150.00 <br />$750.00 <br />Senior Field Technician <br />Per Hour <br />80 <br />$50.00 <br />$4,000.00 <br />Peristaltic Purging Pum <br />Per D <br />10 <br />540.00 <br />$400.DC <br />Feld Technician <br />Per Hour <br />80 <br />$45.00 <br />$3,600.00 <br />Water Level Indicator <br />Per D <br />10 <br />$20.00 <br />$200. <br />Senior Technical Draftsman <br />Per Hour <br />$55.00 <br />Technical Draftsman <br />Per Hour <br />8 <br />$50.00 <br />$400.00 <br />Woonducti' Meter <br />Per D <br />10 <br />$25.00 <br />$250. <br />Technical Secretary <br />Per Hour <br />2 <br />545.00 <br />90.00 <br />urbidfry Meter <br />Per ay <br />10 <br />$55.00 <br />$550. <br />Subtotal: <br />18,715. <br />Dissolved Oxygen Meter <br />Per D <br />10 <br />$55.00 <br />$550. <br />DRILLING <br />MOBI LIZATION(DEMOBI LIZATION <br />Lump Sum Men and Equipment Mob. <br />Per Mob. <br />2 <br />$250.00 <br />$500.00 <br />Tygon Tubing <br />Per Foot <br />40 <br />$2.50 <br />$100.00 <br />Pole em Tubing <br />Per Foot <br />800 <br />$0.60 <br />$480.00 <br />Deionized Water decontamination <br />Per 5 Gal. <br />2 <br />$14.00 <br />$28. <br />55 anon Drum <br />Each <br />4 <br />$65.00 <br />$260.DO <br />Subtotal: <br />COMPACTION AND GRAIN SIZE TEST <br />Standard Proctor ASTM D-698 <br />Per Test <br />$85.00 <br />Modified Proctor ASTM 615 <br />Per Test <br />$85.00 <br />Sieve Arm sis ASTM 0121, D-422 <br />Per Test <br />$65.00 <br />Percent Fines (A TMD 11 40) <br />Per Test <br />$35.00 <br />Subtotal: <br />$0. <br />ANALYTICAL LABORATORY ANALYSIS (Cost plits 15°x) <br />EPA 8021 VOCs -water <br />Per Test <br />40 <br />$69.00 <br />$2,760.00 <br />EPA 8021 VOCs - soil <br />Per Test <br />5 <br />$69.001 <br />$345.00 <br />MONITORING WELL INSTALLATION <br />Temporary 2" PVC Wellpoint <br />Per Foot <br />500 <br />$16.00 <br />$9,0DO.DO <br />EPA 8270 PAH s - water or soil <br />Per Test <br />45 <br />$103.50 <br />$4.657.50 <br />TRPH by FL -PRO - water or soil <br />Per Test <br />45 <br />$80.50 <br />$3,622. <br />DRILLING ON TIME BASIS <br />Decontamination of Equipment <br />Per Hour <br />20 <br />$150.00 <br />$3,000.00 <br />Drumming Contaminated Soil w/o Dis <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8081A (Organochlorine Pest <br />Per Test <br />5 <br />$143.75 <br />$718.7 <br />Drum Disposal non hazardous <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8082 PCB <br />Per Test <br />5 <br />$143.75 <br />$718.7 <br />EPA 8141A (Organophosphorus Pest. <br />Per Test <br />5 <br />$126.50 <br />$832.50 <br />EPA 8151A Herbicides <br />Per Test <br />5 <br />$218.50 <br />$1,092.50 <br />RCRA 8 Metals <br />Per Test <br />5 <br />$68.55 <br />$442.7 <br />Sample Disposal Cost(Lump Sum <br />Lump Sum <br />1 <br />$51.75 <br />$51.7 <br />Direct Push Groundwater Sampling <br />Per Day <br />5 $1,500.00 <br />$7,500.00 <br />Subtotal: <br />$21,200.001 <br />Subtotal:$1=,200 <br />NNEW-W Ardaman & Associat <br />Geotechnical, Environmenta <br />40 <br />13-5402 Level 3 Cost Estimate.xls Printed 2/2/2015 at 12:12 PM <br />