My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2013
CBCC
>
Meetings
>
2010's
>
2013
>
03/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 1:48:20 PM
Creation date
3/23/2016 9:15:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Book and Page
158
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005JM.tif
SmeadsoftID
14664
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 3 — Evaluate 30 -day, 90 -day, 120 -day Coupon Test Results <br />Consultant will coordinate 30 -day coupon testing and evaluate results of the coupon <br />tests for two phases of testing as described herein. Consultant will review 30 day test <br />results to determine if feed rates of corrosion inhibitor are adequate, and determine if <br />additional adjustments to the test rack are necessary. The cost for testing will be by <br />IRCU. <br />Consultant will determine if 90 day or 120 -day coupon testing is advisable based on the <br />30 -day test results. <br />Consultant will evaluate the 30 -day and 90/120 day test results and provide a summary <br />of the results for both phases of testing. <br />TASK 4 — Prepare Summary Report and Recommendations <br />Consultant will prepare up to four copies of a corrosion study technical memorandum <br />summarizing the results of both phases of the 120 day investigation and characterizing <br />the potential for lead and copper corrosion of the finished water as well as the impacts <br />the corrosion inhibitors can have on that projected corrosion. Consultant will review <br />and meet to discuss the results and receive comments. Consultant will attend one <br />review meeting with IRCU staff. <br />Recommendations may consist of further coupon testing, or further adjustments to <br />finish water quality goals. <br />Consultant will provide four (4) copies of final report and electronic version in pdf <br />format. <br />SCHEDULE <br />Consultant will complete these tasks in a timely manner and mutually agreed upon <br />schedule. It is anticipated that the scope of services will be complete within eight (8) to <br />twelve (12) months. <br />FEE SCHEDULE <br />Consultant will provide these services in accordance with our Continuing Services <br />Contract Agreement for Professional Services dated November 15, 2011, extended and <br />amended November 4th, 2014, with Indian River County. <br />TASK 1 Evaluate Distribution System Water Quality $ 4,700 <br />TASK 2 Coordination - Test Rack Testing $13,100 <br />TASK 3 Evaluate 30 -day, 90/120 -day Coupon Test Results $ 5,500 <br />TASK 4 Prepare Summary Report and Recommendations $ 9,600 <br />C TOTAL $32,900 <br />K:\WPB_Civil\General\Miller\Indian River County\Proposals\2015 Coupon Testing IRCU rev3.doc <br />80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.