My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/03/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2019 11:49:07 AM
Creation date
3/23/2016 9:21:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/03/2015
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000M\S00060G.tif
SmeadsoftID
14735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TV <br />7. <br />rJ <br />>� INDIAN RIVER COUNTY FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: February 16, 2015 <br />To: Joseph A. Baird, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services 66) <br />Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager Ao <br />Gordon Sparks, P.E., Environmental Engineer <br />Subject: Approval of Work Authorization No. 2015-001 to Replace Water Main and <br />Water Services in Vista Royale—UCP #4113 <br />DESCRIPTIONS AND CONDITIONS: <br />Over the past five years the Department of Utilities Services (IRCDUS) has been called to Vista Royale for <br />emergency repairs to various water mains and water services. The area with the most breaks has been <br />concentrated west of Vista Palm Lane and includes Buildings 10, 12, 14 and 15. Operations personnel <br />has recommended replacing these mains and services in order to minimize further interruption of service <br />to our customers in this area. <br />ANALYSIS: <br />Staff decided the most efficient and timely method to replace these lines was to utilize one of the two <br />IRCDUS Labor Contractors, Blue Goose Construction or Melvin Bush Construction. A list of the anticipated <br />labor and materials quantities was prepared and bid prices from each of the two contractors was used to <br />calculate the labor expense. The total material costs estimate for both is $15,211.33. The total labor cost <br />estimate for Blue Goose Construction is $71,129.18 (See Attachment 1) and the total labor cost estimate <br />for Melvin Bush Construction is $73,034.58 (See Attachment 2). The total project cost estimate using Blue <br />Goose Construction is therefore $86,340.51. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners approve retaining Blue Goose Construction <br />to replace the lines identified above in Vista Royale for the amount of $71,129.18 and also requests that <br />the Board of County Commissioners approve Work Authorization No. 2015-001(See Attachment 3). <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.