My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/03/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2019 11:49:07 AM
Creation date
3/23/2016 9:21:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/03/2015
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000M\S00060G.tif
SmeadsoftID
14735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Existing flows required for the model update will be provided by the IRCUS. This may <br />include historical water meter data with a return to sewer rate to estimate flows. <br />• The water meter data is spatially located in GIS and can be allocated to nearest node. <br />• IRCUS will provide the updated plans for the facilities if changes have been made <br />since the last model was created and are not included in the geodatabase. <br />• Hydraulic model includes force mains only (no gravity sewer piping). <br />• Calibration shall be based on selected week's data, as agreed with by the IRCUS. <br />• IRCUS shall provide field data where required. Limited coordination efforts are <br />included in this scope for field coordination. <br />DELIVERABLES <br />Atkins shall provide the following: <br />• Updated calibrated hydraulic model for the wastewater conveyance system in WaterCAD <br />software. Technical Memorandum summarizing the model updates, current wastewater <br />flows, calibration data and recommendations for the existing condition scenarios. <br />SCHEDULE <br />It is assumed that all the requested information in this scope will be provided to the consultant in <br />a timely manner and that this effort will be completed within six (6) months from date of execution <br />of this agreement. <br />COMPENSATION <br />The compensation budget is $53,793.83 as presented in Attachment 1. <br />149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.