My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/03/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2019 11:49:07 AM
Creation date
3/23/2016 9:21:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/03/2015
Meeting Body
Board of County Commissioners
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000M\S00060G.tif
SmeadsoftID
14735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />CERTIFICATION OF ENGINEER: <br />certify that I have reviewed the above and foregoing Periodic Estimate for Partial <br />Payment; that to the best of my knowledge and belief it appears to be a reasonably <br />accurate statement of the work performed and/or material supplied by the Contractor. I am <br />not certifying as to whether or not the Contractor has paid all subcontractors, laborers, <br />materialmen and suppliers because I am not in a position to accurately Bete ine that issue. <br />Dated r ' <br />SIGNATURE <br />CERTIFICATION OF INSPECTOR (IF REQUIRED): <br />I have checked the estimate against the Contractor's Schedule of Amounts for Contract <br />Payments and the notes and reports of my inspections of the project. To the best of my <br />knowledge, this statement of work performed and/or materials supplied appears to be <br />reasonably accurate, that the Contractor appears to be observing the requirements of the <br />Contract with respect to construction, and that the Contractor should be paid the amount <br />requested above, unless otherwise noted by me. I am not certifying as to whether or not the <br />Contractor has paid all subcontractors, laborers, materialmen and suppliers because I am <br />not in a position to accurately determine that issue. <br />Dated <br />SIGNATURE <br />w�rwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww,rwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww�rwwwawwwwwwwwwwwwwwwwwwwww*w <br />[The Remainder of This Page Was Left Blank Intentionally] <br />Page 5 of 5 <br />Pay App #5 - Coversheets <br />00622-4 <br />ZA01JOSMAclive JoWIRC Dune Repak%Pay AppelPay App #Wsy App N5 - Coverslwels dock Rev 05M <br />176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.