My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/12/1990
CBCC
>
Meetings
>
1990's
>
1990
>
6/12/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:45 PM
Creation date
6/16/2015 9:05:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/12/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT/ENGINEERING SERVICES CONTRACT (KIMBALL/LLOYD ASSOC_ - <br />43RD AVE. WATER MAIN EXTENSION) <br />The Board reviewed memo from Engineer William McCain: <br />DATE: JUNE 1, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />STAFFED AND <br />PREPARED BY: WILLIAM F <br />TS ENGINEER <br />UTILITY SERVICES <br />SUBJECT: AM D ENT TO ENGINEERING SERVICES CONTRACT WITH <br />KI /LLOYD AND ASSOCIATES, INC., FOR EXTRA <br />SERVICES ON THE 43RD AVENUE WATER MAIN EXTENSION <br />INDIAN RIVER COUNTY PROJECT NO. UW -89 -16 -DS <br />BACKGROUND: <br />The firm of Kimball/Lloyd and Associates, Inc., is currently under <br />contract- with the Department of Utility Services for the design of <br />611, 8" and 12" diameter water mains on 43rd and 44th Avenues and <br />19th Street. In addition to the original design, the following <br />items had to be added: <br />1. The design of an additional 1,930 linear feet of 4" to 12" <br />diameter pipe and associated valves, fittings and hydrant <br />assemblies <br />2. The design of 28'additional water services <br />3. Additional pavement/sidewalk/driveway restoration and <br />grassing <br />ANALYSIS <br />The original design fee was based on 11.4% (9.3% design/construction <br />administration plus 2.1% surveying) of the estimated construction <br />cost of $201,000.00. As a result of these design changes, the <br />construction cost has increased $33,056.00. This increases the job <br />cost to approximately $234,000.00 at 11.1%; the engineering fee <br />increases $3,070.00 (see attached Kimball/Lloyd letter and cost <br />estimate). <br />RECOMMENDATION <br />The 'staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached work <br />authorization amendment with Kimball/Lloyd and Associates, Inc. <br />Chairman Eggert asked why these items had to be added. <br />Engineer McCain explained that the initial proposed line <br />connection shot over off of 43rd Avenue to 44th Avenue, which is <br />a dirt road for construction, and ince had to go back and look at <br />73 <br />GOOK <br />JUN 12 1990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.