Laserfiche WebLink
JUN 2 6 1990 <br />Bou 0 F,:u 4�' � <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Wheeler, the Board unanimously.(4-0) approved <br />Engineering Work Authorization WW -4 w/Masteller and <br />Moler Associates, Inc., as recommended by staff. <br />MASTELLER & MOLER ASSOCIATES, INC. <br />M CONSULTING ENGINEERS • LAND PLANNERS [ <br />-------------------- <br />Post offlce Box 781045 <br />Sebastian, Florida 32978-1045 <br />(407) 5894800 ENGINEERING WORK AUTHORIZATION <br />(407)589.2742 Fax <br />DATE: April 30, 1990 WORK AUTHORIZATION NO. WW -4 FOR CONSULTING <br />SERVICES. PROJECT NO. COUNTY, I.D. 86004 MASTELLER & MOLER <br />ASSOCIATES, INC. WASTEWATER. <br />'I. PROJECT DESCRIPTION - <br />,•_Title: .-North Subre ional Sewer Project Contract #3 ~'.*r... <br />' <br />Engineering design and preparation of contract plans covering redesign <br />and revisions to the contract plans as desribed on attached invoices <br />86004/149LB, 86004/155, 86004/149LA, 86004/161 and 86004/160. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Master Agreement for Utilities Service'" dated <br />October 4, 1988, and specific Article numbers and paragraph numbers which <br />are listed hereunder to describe the scope of service included on this. <br />project. <br />3 <br />A. Project Design Services per Master Agreement. <br />B: General Services During Construction per Master Agreement. <br />The Resident Inspector shall be a full-time employee of the <br />Engineering Consultant. The Resident Inspector's duties shall be to <br />monitor construction and be at the job site when project construction is <br />taking place, on a prescheduled periodic basis. <br />C. General Services During Construction per Master Agreement. <br />In addition, services shall include field surveys necessary for <br />design and preparation of construction plans and, with assistance. from <br />the County, obtaining various permits and approvals for construction <br />(permit fees to be paid by the County). <br />Also, " in addition, the consultant shall, with the approval of this <br />authorization, submit a time phased job completion schedule. This task <br />oriented schedule, as negotiated, shall include these elements of work: <br />1. Releases from each public utility pertaining to', underground <br />installations and/or interfering utility structures. <br />2. Submittal of all required permits and inspection schedules. <br />3. First and final submittal of construction drawings. <br />4. Submittal of construction contract bid-- packages (5), with <br />recommended construction completion time frame and a complete list of <br />all material required for project installation. <br />Note: Failure to meet these negotiated nchedules will leave consultant <br />open for a negative psorformanr_.p eva.luatio11, and/or contract: <br />cancellation, or liquidated damages. <br />32 <br />